My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting Memorandum 09/10/2003 (B)
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Board Meeting Memorandum 09/10/2003 (B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 2:25:54 PM
Creation date
9/10/2014 2:25:49 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/10/2003
Description
Non Reimbursable Projects Tamarisk Coalition, Infested Acres Inventory
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Non-reimbursable Investment Application-CWCB Construction Fund <br /> Form Revised August 8,2003 <br /> 1111 <br /> If"NO",describe existing rights: The Tamarisk Coalition owns no existing water <br /> rights Water Right CFS. Average water diverted per year <br /> Acre-feet <br /> 7. Please list the names and addresses of any technical or legal consultants retained to <br /> represent the applicant or to conduct investigations for the proposed project or study: <br /> NAME ADDRESS and PHONE <br /> Mesa State College through its Environmental Science program will provide <br /> technical assistance and four college interns to perform the on-the-ground <br /> surveys. <br /> 8. List any feasibility study or scope of work that has been completed or is now in progress for <br /> the proposed project or study. (Please submit one copy with this application): <br /> Impact of Tamarisk Infestation on the Water Resources of Colorado, <br /> • <br /> prepared for the Colorado Department of Natural Resources Colorado Water <br /> p <br /> Conservation Board, May 30, 2003 by the Tamarisk Coalition. <br /> 9. What is the estimated cost of the project or study? Please include estimated Planning, <br /> Engineering, and Construction costs, if known: <br /> Estimated Planning/Study Costs: $ 105,000 <br /> Estimated Engineering Costs: $ <br /> Estimated Construction Costs: $ <br /> Estimated Total Costs: $ 105,000 <br /> (see attached detailed cost estimate) <br /> 10. What amount are you requesting? $ 52,500 <br /> Where will the rest of the funding come from? <br /> • <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.