My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2007
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 10:37:37 AM
Creation date
8/19/2014 10:27:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/18/2007
Description
Finance Sub-Committee Meeting September 18, 2007
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Project Construction Program—Project Data <br /> Applicant: Division of Water Resources and Colorado Water Conservation Board <br /> • Project Name: Satellite-linked Monitoring Project Type: Stream Gaging g <br /> System and Flood Hardening Program <br /> County: Statewide Drainage Basin: Water Source: N/A <br /> Statewide Drainage Basins <br /> Total Study Cost: $350,000 Funding Sources: CWCB <br /> CWCB Investment: Interest Rate: N/A Term: N/A <br /> $350,000 <br /> • <br /> • <br /> This project entails the continued, long-term operational viability of the State Satellite Linked <br /> Monitoring System,which is administered by the Division of Water Resources (DWR). It also <br /> involves the continued implementation of the joint DWR/CWCB Flood Hardening Program. <br /> The Satellite-linked monitoring system,which is comprised of over 450 satellite-gaging stations, <br /> requires continued renovation and flood hardening of existing gages,replacement of outdated <br /> data collection platforms and upgrades to transmission components. In addition,many existing <br /> gaging stations need to be modified to provide critical stream flow data for flood warning and <br /> low flow monitoring. Changes in technology,which will ultimately increase reliability and real <br /> time data transmission rates will require the DWR to continue to upgrade the system in the <br /> future. The costs associated with the continued refurbishment and operational viability of the <br /> system is approximately$300,000 per year. The associated flood hardening cost are $50,000 per <br /> year. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.