My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2008
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2015 3:48:30 PM
Creation date
8/18/2014 10:35:36 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/16/2008
Description
Finance Sub-Committee Meeting September 16, 2008
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Non-reimbursable Investment Application-CWCB Construction Fund <br /> • Form Revised July 17,2008 <br /> Construction Fund exists primarily to provide low interest loans for the construction or <br /> rehabilitation of Raw Water Projects.Non-reimbursable Investments are approved only <br /> when the project or study is of statewide interest and benefits a wide range of people and <br /> organizations, and/or a large geographical area. The applicant(s)must also show that they <br /> are financially unable to repay a loan): Response:A regular funding program does not <br /> currently exist for non-federal matching dollars,other than the CWCB construction fund, for <br /> the required non-federal cost-share that would allow Colorado to fully take advantage of <br /> millions of federal grant dollars over the coming years. FEMA is providing increased levels <br /> of funding for floodplain map modernization in those States that are able to support and <br /> provide matching funds. The State match is bolstered by additional matching dollars and in- <br /> kind services from local governments,which allows Colorado to capitalize on this <br /> tremendous opportunity. The goal is to update and modernize Colorado's aging fleet of <br /> floodplain maps for floodplain management, flood hazard mitigation, flood insurance, and <br /> flood response purposes. In addition, the new digital maps will eventually be integrated into <br /> the proposed Flood DSS to enhance Colorado's decision making tools. <br /> 6. Will the acquisition of additional water rights be necessary? YES NO X <br /> If"YES",please explain: <br /> If "NO", describe existing rights: N/A <br /> Water Right CFS. Average water diverted per year Acre-feet <br /> 7. Please list the names and addresses of any technical or legal consultants retained to represent <br /> the applicant or to conduct investigations for the proposed project or study: <br /> NAME ADDRESS and PHONE <br /> PBS&J Englewood, CO—303-221-7275 <br /> Anderson Consulting Engineers Fort Collins, CO—970-226-0120 <br /> 8. List any feasibility study or scope of work that has been completed or is now in progress for <br /> the proposed project or study. (Please submit one copy with this application): <br /> • <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.