Laserfiche WebLink
I <br /> I5.0 Studies and Investigations <br /> 1' From time to time over the years, the Board has recommended, and the General <br /> Assembly has approved, the use of the Construction Fund to support a number of non- <br /> reimbursable (grant) studies, investigations, and projects. In FY 99, the Board <br /> Irecommended 8 non-reimbursable studies and projects totaling $3.99 million. These <br /> grant recommendations, which were incorporated into SB 99-173 and passed by the <br /> General Assembly, are listed in the table below. <br /> I <br /> I TABLE 14 <br /> Colorado Water Conservation Board <br /> 1999 Grant Recommendations <br /> i <br /> e <br /> Grar�i+e��—�'r4,�eci i K � Cac�nty At�notrnt: <br /> II CWCB and State Engineer- basinwide 3,158,380 <br /> Rio Grande Decision Support System Data Collection&Design Continuation <br /> State Engineer- statewide 120,000 <br /> ISatellite Monitoring System Maintenance Continuation <br /> CWCB- basinwide 40,000 <br /> Arkansas River Multi-Objective Management Plan Continuation <br /> ICWCB- statewide 270,000 <br /> Imaging System for the Construction Fund Project Records <br /> I CWCB and State Engineer basinwide 100,000 <br /> South Platte River Decision Support System Feasibility Study <br /> I San Luis Valley Water Conservancy District basinwide 200,000 <br /> Rio Grande Headwaters Restoration Project <br /> Southeastern Colorado Water and Storage Needs Assessment Enterprise- basinwide 25,000 <br /> IArkansas River Basin Water and Storage Needs Assessment Phase 2 <br /> CWCB- Arapahoe 75,000 <br /> I Cherry Creek Reservoir Flood Safety Investigation <br /> Total $3,988,380 <br /> 5.1 Rio Grande Decision Support System Data Collection and Design <br /> n Y g <br /> Continuation <br /> IThe Board recommended an appropriation of $2,983,380 during FY 99-00 to the <br /> Division of Water Resources and the CWCB for the continued development of the Rio <br /> IGrande Decision Support System (RDGSS). The Board also appropriated an additional <br /> $175,000 for 2.5 FTE's to support project management and well data quality checking. <br /> The project is estimated to cost up to $5.0 million over 3 years including $3.5 million for <br /> Idata collection and $1.5 million for design. The Board originally recommended an — <br /> CWCB FY99 Annual Report,page 29 <br />