Laserfiche WebLink
I <br /> forward or if it should be de-authorized. After a project has been completed, the I <br /> remaining unspent, but still encumbered, funds are de-authorized as soon as possible. <br /> The Board recommended, and the General Assembly approved, twelve loans totaling I <br /> $14.35 million that were de-authorized in FY99. <br /> TABLE 13 I <br /> Colorado Water Conservation Board <br /> Loans De-authorized in FY 98-99 <br /> yyy�'p (��y 'y'�`' �� g �y11) Ilt� , o p' Qs <br /> City of Broomfield- HB 95-1155 $3,000,000 $3,000,000 $0 <br /> Great Western Dam Rehabilitation <br /> San Miguel Water Conservancy District- HB 85-1042 $7,500,000 $7,500,000 $0 <br /> Phase 2 Project <br /> Lone Cone Reservoir HB 85-1042 $1,012,500 $1,012,500 $0 I <br /> Melvin L.Thiebaud- HB 95-1155 $18,750 $18,750 $0 <br /> Eureka Dam No. 1 Rehab and Enlargement <br /> Pine River Irrigation Company SB 92-87 $190,000 $190,000 $0 <br /> Town of New Castle- SB 96-153 $266,500 $266,500 $0 I <br /> Raw Water Pipeline Rehabilitation <br /> City of Greeley- HB 98-1189 $787,500 $787,500 $0 <br /> Twin Lakes Dam Rehabilitation <br /> Purgatoire River Water Conservancy District- HB 98-1189 $1,000,000 $1,000,000 $0 <br /> Trinidad Project Refinance <br /> Leroux Creek Water Users Association- HB 95-1155 $150,000 $150,000 $0 <br /> Rehabilitate and/or enlarge four reservoirs <br /> Highline Buzzard Ditch Company- SB 94-029 $50,000 $50,000 $0 i <br /> Convert Ditch to Pipeline <br /> Ortiz Ditch Company- HB 95-1155 $20,000 $20,000 $0 I <br /> Rehabilitate Ortiz Diversion Structure <br /> City of Fort Lupton- HB 95-1155 $354,000 $354,000 $0 I <br /> Drill New Municipal Wells <br /> Totals $14,349,250 $14,349,250 $0 I <br /> I <br /> 1 <br /> CWCB FY99 Annual Report,page 28 <br />