Laserfiche WebLink
I <br /> I <br /> TABLE 2, Performance Audit Recommendations <br /> ••- <br /> REC.� -�; �, �t�� � <br /> No . iec�mmendafion,Summary-- r s : • - <br /> Progress as�of�une�=3O,.s1997°. -;� <br /> 1 Develop a formal,systematic program or process which Completed. The Board agreed to implement this <br /> provides a long-and short-term framework for the use of recommendation by 12/93. The Board identified 5 long- <br /> the Construction Fund. This process should include term goals at its January 1993 meeting. The Board attended <br /> developing broad policy statements,establishing goals a retreat in October 1993 to develop a draft Long Range <br /> and implementation plans and developing performance Plan. The Board's Long Range Plan was formally adopted <br /> measures. on September 14, 1994 and revised July 1995. <br /> 2 Develop and implement an effective process for long- Completed. The Board agreed to implement this <br /> term financial planning of Construction Fund monies. recommendation by 12/93. The Board staff worked with <br /> This process should include establishing long-term DNR accounting to set up a better method of systematically <br /> funding needs,assessing current sources of funds,and reporting revenues. All accounts have been reconciled. A <br /> projecting future funding requirements that may be water user needs survey was completed in July 1993. A <br /> needed to meet long-term goals. Long-Term Financial Projection for the Construction Fund <br /> was completed in December 1993 and is revised annually. <br /> 3 Establish guidelines which include setting loan interest Completed. The Board agreed to partially implement this <br /> rates to reflect market interest rates. The Guidelines recommendation by 7/93. The Board approved new <br /> should be reflected in the projects that will be authorized "standard" interest rate guidelines at 2 basis points below <br /> during the upcoming legislative session. the then 30-year Treasury Bond rate for 30 years at its May <br /> 6-7, 1993 meeting. A project evaluation matrix is being <br /> used on new projects. <br /> 4 Charge interest on cash disbursements made to project Completed. The Board agreed to implement this <br /> sponsors during the construction phase of projects. recommendation by 12/93. The Board adopted this new <br /> Interest charges could be added to the principal amount policy at its May meeting. The Contracts for future <br /> of the loan and financed over the term of the loan. construction projects will require interest during <br /> construction. <br /> 5 Improve Board monitoring of projects by contacting Ongoing. The Board agreed to implement this <br /> project sponsors at least annually to determine if project recommendation by 12/93. Letters are sent in Sept. to Nov. <br /> sponsors plan to go ahead with the projects. Responses to the sponsors for certain authorized but not yet constructed <br /> should be documented and reported to the General CWCB projects. The staff evaluates the status of the project <br /> Assembly on an annual basis. and determines if it should be deauthorized. <br /> 6 Develop and implement procedures which would recover Completed. The Board agreed to implement this <br /> the Board's share of feasibility study costs for projects recommendation by 10/93. The Board adopted a new policy <br /> that are not constructed. Alternatives should be at its May 1993 meeting that stated the Board's participation <br /> evaluated,including payback over a period of time. in feasibility study costs must generally be repaid whether <br /> the project is constructed or not. The Guidelines have been <br /> revised to reflect this policy. <br /> 7 Develop methods to demonstrate Board compliance with Completed. The Board agreed to implement this <br /> procedures it has established,including documentation of recommendation by 7/93. A project checklist was prepared <br /> all Board reviews and approvals. by staff in July 1993. A standard contract information sheet <br /> was developed. Several procedures have been written <br /> down. Insurance certificates and UCC documents are <br /> tracked. A computer tracking system was designed in 1997. <br /> t <br /> CWCB FY97 Annual Report,page 14 1 <br />