Laserfiche WebLink
I <br /> IMILITARY PARK RESERVOIR REHABILITATION <br /> I4 ' <br /> ,-,E-'111N,..f::,;;,-„ - l'-'414miiv-:i:s',:l.,::s —N,:.,... , '.-..-- <br /> ` 1 1 `- , • v <br /> ,, <br /> r <br /> y <br /> >4 pA ::. ,--r v <br /> =-i . <br /> IMilitary Park Reservoir Breached Dam <br /> IProject Description <br /> The project consisted of the replacement of the earth fill dams outlet works including a precast <br /> Ioutlet structure, 12" PVC outlet pipe and reinstalled gate assembly. The dam was breached in <br /> late 1994 for the necessary construction and not completed until mid-October 1995 due to <br /> lingering snowpack on the Grand Mesa. <br /> Project Data <br /> ISponsor: Military Park Reservoir Co. County: Delta River: Off-Stream Grand Mesa <br /> Terms of Loan: $30,000 @ 4.0 % for 30 years Substantial Completion: Oct. 15, 1995 <br /> IDesign Engineer: Ed Currier, P.E. - Grand Junction, Colorado <br /> IConstruction Contractor: Colorado West Contracting, Inc. - Grand Junction, Colorado <br /> Design Criteria: 12 inch PVC outlet pipe <br /> I1,200 cu.yd. of embankment material <br /> Annual Volume of Water Removed from Restriction by the Project: 232 acre-feet <br /> I <br />