Laserfiche WebLink
I <br /> 4.0 Non-Reimbursable (Grant) Projects <br /> IFrom time to time over the years, the Board has recommended, and the General Assembly has <br /> approved, the use of the Construction Fund to support a number of non-reimbursable(grant)studies, <br /> I investigations, and projects. This year the Board is recommending 11 non-reimbursable studies and <br /> projects totaling $5.0 million. These grant recommendations are listed in Table 7 below. <br /> I Table 7 <br /> Colorado Water Conservation Board <br /> 1997 Grant Recommendations <br /> I <br /> Grantee- Project County Amount <br /> ICWCB and State Engineer- west slope 320,000 <br /> Colorado River Decision Support System <br /> IState Engineer- statewide 120,000 <br /> Satellite Monitoring System Maintenance <br /> I CWCB -Extreme Precipitation Study Continuation and west slope 400,000 <br /> Revisions to the NOAA Atlas <br /> I CWCB -Roaring Fork River Multi-objective Management Pitkin, Eagle, 50,000 <br /> Plan Continuation and Garfield <br /> I CWCB - 50,000 <br /> Arkansas River Multi-objective Management Plan <br /> I CWCB - Statewide River Rehabilitation and Floodplain statewide 100,000 <br /> Management Needs Inventory <br /> CWCB - Douglas 300,000 <br /> IChatfield Reservoir Reallocation Study <br /> South Platte Lower River Group - Tamarack Project and 300,000 <br /> IContinuation of Demonstration Projects <br /> US Fish and Wildlife Service- Mesa 1,250,000 <br /> IGrand Valley Water Management Project <br /> Colorado Division of Wildlife- Rio Grande 2,000,000 <br /> INative Aquatic Species Facility <br /> State Engineer- 100,000 <br /> I Arkansas River Basin Well Pumping Study <br /> Total 4,990,000 <br /> I <br /> 1 CWCB FY96 Annual Report,page 25 <br />