My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Annual Report December 1996
CWCB
>
Publications
>
DayForward
>
CWCB Annual Report December 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:44:42 AM
Creation date
8/14/2014 3:15:20 PM
Metadata
Fields
Template:
Publications
Year
1996
Title
Annual Report to the 61st Colorado General Assembly First Regular Session
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> 4.0 Non-Reimbursable (Grant) Projects <br /> IFrom time to time over the years, the Board has recommended, and the General Assembly has <br /> approved, the use of the Construction Fund to support a number of non-reimbursable(grant)studies, <br /> I investigations, and projects. This year the Board is recommending 11 non-reimbursable studies and <br /> projects totaling $5.0 million. These grant recommendations are listed in Table 7 below. <br /> I Table 7 <br /> Colorado Water Conservation Board <br /> 1997 Grant Recommendations <br /> I <br /> Grantee- Project County Amount <br /> ICWCB and State Engineer- west slope 320,000 <br /> Colorado River Decision Support System <br /> IState Engineer- statewide 120,000 <br /> Satellite Monitoring System Maintenance <br /> I CWCB -Extreme Precipitation Study Continuation and west slope 400,000 <br /> Revisions to the NOAA Atlas <br /> I CWCB -Roaring Fork River Multi-objective Management Pitkin, Eagle, 50,000 <br /> Plan Continuation and Garfield <br /> I CWCB - 50,000 <br /> Arkansas River Multi-objective Management Plan <br /> I CWCB - Statewide River Rehabilitation and Floodplain statewide 100,000 <br /> Management Needs Inventory <br /> CWCB - Douglas 300,000 <br /> IChatfield Reservoir Reallocation Study <br /> South Platte Lower River Group - Tamarack Project and 300,000 <br /> IContinuation of Demonstration Projects <br /> US Fish and Wildlife Service- Mesa 1,250,000 <br /> IGrand Valley Water Management Project <br /> Colorado Division of Wildlife- Rio Grande 2,000,000 <br /> INative Aquatic Species Facility <br /> State Engineer- 100,000 <br /> I Arkansas River Basin Well Pumping Study <br /> Total 4,990,000 <br /> I <br /> 1 CWCB FY96 Annual Report,page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.