My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Annual Report December 1996
CWCB
>
Publications
>
DayForward
>
CWCB Annual Report December 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:44:42 AM
Creation date
8/14/2014 3:15:20 PM
Metadata
Fields
Template:
Publications
Year
1996
Title
Annual Report to the 61st Colorado General Assembly First Regular Session
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> 3.11 Restoration of Emergency Infrastructure Repair Loan Account Balance <br /> The Board recommends a total of $960,000 be transferred from unreserved cash in the <br /> Construction Fund to bring the balance in the Emergency Infrastructure Repair Loan Account back <br /> to $2 million. Since its creation in 1993,the Board has authorized 7 loans with contract amounts <br /> totaling $960,000 from the account for qualifying projects in Montezuma, Larimer, Rio Blanco, <br /> Douglas, Clear Creek, and Las Animas counties. <br /> 3.12 Salinity Control Program Loans <br /> The Board recommends it be authorized to expend a cumulative total of $1,000,000 from <br /> unreserved cash in the Colorado water conservation board construction fund for loans to participants <br /> in the Colorado river basin salinity control program. Such loans shall be at the terms and conditions I <br /> the Board determines after review and approval of each potential participant's application. The loan <br /> amount shall not exceed 50%of the total cost of constructing any particular salinity control project. <br /> 3.13 Horse Creek Basin Loan Account <br /> At the January 1997 meeting, the Board recommended the creation of the Horse Creek Basin <br /> Account in the Construction Fund. The account should have an initial balance of$915,000. The I <br /> Board recommended it be authorized to make loans from the account to borrowers in the Horse <br /> Creek basin for the purpose of acquiring water rights,with an initial loan for up to $825,000 from <br /> the account to the Horse Creek Water Users Association. I <br /> 1 <br /> r <br /> r <br /> I <br /> I <br /> 1 <br /> CWCB FY96 Annual Report,page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.