Laserfiche WebLink
Water Supply Reserve Account—Application Form <br /> Revised December 2011 <br /> TASK 3-BOOSTER STATION C <br /> 19 FURNISH&INSTALL 15X8 REDUCERS 2 EA 600.00 1,200 <br /> 20 FURNISH&INSTALL PIPING PER PLAN 1 LS 1,440.00 1,440 <br /> SPECIALTIES <br /> 21 FURNISH&INSTALL 8"CHECK VALVE 1 EA 6,641.50 6,642 <br /> 22 FURNISH&INSTALL8"BF VALVES 2 EA 1,380.00 2,760 <br /> 23 FURNISH&INSTALL 6"FLOW METER WITH 5-20 ma OUTPUT 1 EA 6,000.00 6,000 <br /> FURNISH&INSTALL SUCTION AND DISCHARGE PRESSURE <br /> 24 TRANSDUCERS WITH 5-20 ma OUTPUT 2 EA 150.00 300 <br /> 25 FURNISH&INSTALL 8"GATE VALVE 1 EA 1,380.00 1,380 <br /> 26 FURNISH&INTALL 1"AIR-VAC VALVE 1 EA 948.38 948 <br /> 27 FURNISH&INSTALL 100 HP BOOSTER PUMP 1 EA 50,334.00 50,334 <br /> 28 FURNISH 125 KVA GENERATOR 3 EA 70,700.00 212,100 <br /> 29 FURNISH 100 KVA GENERATOR 1 EA 49,250.00 49,250 <br /> 30 INSTALL GENERATORS 4 EA 10,000.00 40,000 <br /> 31 FREIGHT FOR GENERATORS(2TRUCKS*1300 MI) 2600 MILES 3.00 7,800 <br /> 32 BUILDING FOR BOOSTER STATION C 1 EA 17,100.00 17,100 <br /> TASK 4-MISCELLANEOUS <br /> SUPERVISORY CONTROL AND DATA SYSTEM FOR 3 BOOSTER <br /> 33 STATIONS,4 WELL PUMPS&ELECTRIC SHUT-OFF VALVE 1 EA 82,133.00 82,133 <br /> 34 PROJECT MANAGEMENT&ADMIN 12,000.00 12,000 <br /> 35 CONTINGENCY(<7%OF CONSTRUCTION) 175,643.00 175,643 <br /> TOTAL PHASE II $ 2,780,000 <br /> TOTAL PROJECT COST 3,381,404 <br /> The above statements are true to the best of my knowledge: <br /> Signature of Applicant: <br /> Print Applicant's Name: Tobe Allumbaugh <br /> Project Title: Ordway Feedyard Water Line Extension <br /> Return an electronic version(hardcopy may also be submitted)of this application to: <br /> Greg Johnson—WSRA Application <br /> Colorado Water Conservation Board <br /> 1580 Logan Street, Suite 200 <br /> Denver,CO 80203 <br /> gregory.johnson@state.co.us <br /> 16 <br />