My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150349 Application
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150349 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:32:26 PM
Creation date
5/29/2014 12:56:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150349
Contractor Name
Ordway Feedyard, LLC
Contract Type
Loan
Water District
17
County
Crowley
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Water Supply Reserve Account—Application Form <br /> Revised December 2011 <br /> Deliverable <br /> Completed improvements. <br /> PROJECT SCHEDULE START DATE FINISH DATE <br /> FINAL DESIGN Upon NTP NTP+45 days <br /> PROPOSAL SOLICITATIONS NTP+45 days NTP+60 days <br /> PIPELINE CONSTRUCTION NTP+75 days NTP+245 days <br /> BOOSTER STATION C CONSTRUCTION NTP+75 days NTP+170 days <br /> EMERGENCY STANDBY GENERATORS NTP+120 days NTP+245 days <br /> SCADA INSTALLATION NTP+170 days NTP+170 days <br /> ORDWAY FEEDYARD WATER LINE EXTENSION-PHASE II <br /> BUDGET BY TASK <br /> (ITEM (DESCRIPTION (QUANTITY I UNITS I UNIT COST I AMOUNT <br /> PHASE I: (funding by Ordway Cattle Feeders,LLC and LAVWCD) <br /> a PRELIMINARY DESIGN 14,904.40 14,904 <br /> b REHAB OF EXISTING LINE: OCT-DEC 2012 453,000.00 453,000 <br /> c REHAB OF EXISTING LINE: REMAINING 125,000.00 125,000 <br /> d RE-ESTABLISH EASEMENTS FOR EXISTING LINE 6,000.00 6,000 <br /> e ADMINISTRATIVE-GRANT WRITING(LAVWCD) 2,500.00 2,500 <br /> TOTAL PHASE I 601,404 <br /> PHASE II <br /> TASK 1-FINAL DESIGN <br /> 1 PROFESSIONAL ENGINEER 64 HR 125.00 8,000 <br /> 2 EIT ENGINEER 120 HR 90.00 10,800 <br /> 3 CAD TECHNICIAN 160 HR 62.00 9,920 <br /> 4 SURVEY CREW 32 HR 245.00 7,840 <br /> 5 MILEAGE 270 MI 1.10 297 <br /> 6 PRINTING COSTS 920 SF 0.90 828 <br /> TASK 2-PIPELINE <br /> 7 FURNISH 15"DIA,CLASS 80 PVC PIPE 54,500 LF 9.97 543,365 <br /> 8 INSTALL 15"DIA,CLASS 80 PVC PIPE 54,500 LF 24.95 1,359,775 <br /> 9 FURNISH&INSTALL 15"DIA 90 ELLS 5 EA 887.13 4,436 <br /> 10 FURNISH&INSTALL 15"DIA 45 ELLS 28 EA 709.64 19,870 <br /> 11 FURNISH&INSTALL 15X15 TEES 12 EA 815.22 9,783 <br /> 12 FURNISH&INSTALL 15"BF VALVES 7 EA 2,000.00 14,000 <br /> 13 FURNISH&INSTALL BLOW-OFF ASSEMBLIES 2 EA 2,000.00 4,000 <br /> 14 FURNISH&INSTALL 8"ALTITUDE VALVES 3 EA 6,641.50 19,925 <br /> 15 FURNISH&INSTALL FIRE HYDRANTS 10 EA 3,700.00 37,000 <br /> 16 BORE CROSSING HWY 207-INSTALL 24"CASING 1 EA 18,000.00 18,000 <br /> 17 BORE CROSSING HWY 71-INSTALL 24"CASING 1 EA 24,500.00 24,500 <br /> 18 CASING PROVIDED BY L&M UNDERGROUND 250 LF 82.53 20,632 <br /> (continued on next page) <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.