My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150335 Application
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150335 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:43:23 PM
Creation date
5/29/2014 12:56:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150335
Contractor Name
Center of Colorado Water Conservancy District
Contract Type
Loan
County
Park
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> Addendum to Center of Colorado Water Conservancy District's <br /> Loan Application to CWCB for Smelter Pipeline Reservoir Project <br /> Page 4 <br /> repayment term), Center's annual debt service would total $134,000.00, or <br /> approximately 32% of general fund revenues. Center has no other debt or <br /> obligations. <br /> The contract to be awarded to Hudick Excavating is for $565,800.00 and the loan <br /> amount requested is for $400,000.00. The requested loan amount is <br /> approximately 70.10% of the construction costs. <br /> F. Water Rights. The Center of Colorado does not need to obtain any new <br /> water rights in order to make full use of the SPR as all decrees necessary are <br /> already obtained. <br /> G. Project alternatives. The SPR is an off-channel facility constructed adjacent <br /> to Mosquito Creek. The SPR is the adjudicated augmentation water source for the <br /> Adventure Placer Subdivision as adjudicated in Case No. 80CW194, District Court, <br /> Water Division No. 1. At the time Center acquired the SPR in 2005, it agreed with <br /> the Seller of the SPR that it would assume the augmentation obligations for the <br /> Adventure Placer Subdivision. Since the SPR is already required to be the <br /> augmentation release source for an existing subdivision on Mosquito Creek and it <br /> is an existing structure with existing inlet and outlet works, there are no reasonable <br /> alternatives for the location of the SPR. <br /> H. Impacts. The Project is for the reconstruction of the existing SPR and the <br /> inlet and outlet works. Center has obtained the 404 permit for the project and no <br /> environmental impacts associated with the project were identified. Park County <br /> has determined that the County's 1041 permit regulations do not apply to the <br /> Project. <br /> I. Design features. The Project consists of four main components: 1) <br /> reshaping, deepening and enlarging the existing structure from 21 AF to 28 AF; 2) <br /> reconstructing the diversion inlet and pipeline from Mosquito Creek to the SPR; 3) <br /> lining of the modified structure with a PVC liner; and 4) reconstruction of the outlet <br /> works. The Project Manual including the plans and specifications for the Project <br /> are attached. Also attached are copies of the Hudick Excavating Bid and the Bid <br /> Modification Schedule. <br /> The original bid from Hudick Excavating was in the amount of 593,490.00. <br /> Subsequent to the receipt of the Hudick bid, Center and Hudick renegotiated <br /> several components of the project, thus reducing the total contract with Hudick to <br /> $565,800.00. <br /> J. Rights of Way. Center of Colorado owns the property upon with the SPR is <br /> located. Access to the SPR is from County Road 12 (the Mosquito Pass Road) <br /> which is located off of State Highway 9 between the Towns of Alma and Fairplay. <br /> No materials are anticipated to be exported or imported to the Project site, thus <br />
The URL can be used to link to this page
Your browser does not support the video tag.