My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150335 Application
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150335 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:43:23 PM
Creation date
5/29/2014 12:56:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150335
Contractor Name
Center of Colorado Water Conservancy District
Contract Type
Loan
County
Park
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Application <br /> 7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br /> att omey(s). <br /> NAME ADDRESS and PHONE <br /> Tom Dea, P.E. TZA Water Engineers,12596 W.Bayaud Avenue,Suite 330 Lakewood,CO 80228 303-971-0030 <br /> James . Culichia See # 2 above <br /> 8. List any feasibility studies or other investigations that have been completed or are now in <br /> progress for the proposed project. If so,submit one copy of the study with this application <br /> A feasibility analysis and other information requested in the CWCB's Water Project <br /> Loan Program Guidelines is in the attached Addendum. <br /> 9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br /> construction costs,if known. <br /> Estimated Engineering Costs:$ $N/A <br /> Estimated Construction Costs: $565,800 <br /> Estimated Other costs: $N/A (land,water rights purctâ–ºase,etc.) <br /> Estimated Total Costs: $$565,800 <br /> 10. Loan amount and terms you are requesting. <br /> Requested Loan Amount: $400,000.00 (usually 90%of est.Total Costs) <br /> Term(length)of loan: 10 years (Usually 10,20,or 30 years) <br /> interest Rate: 3.0 % (Please call for our current rates) <br /> Part C.-Project Sponsor Financial Information <br /> Because the CWCB's Fund is a revolving fund, it is important that the project sponsor have the <br /> financial capacity to repay any loans made by the CWCB. The following information is needed to <br /> assist the CWCB in a preliminary assessment of the applicant's financial capacity. The project <br /> sponsor will submit the three most recent annual financial statements. <br /> 1. List any existing long-term liability (multi-year) or indebtedness that exceeds one thousand <br /> dollars. For example, bank loans, government agency loans,bond issues,accounts payable,etc. <br /> Include names and addresses of lenders,amounts,due dates and maturity dates. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.