Laserfiche WebLink
I <br /> CWCB Water Project Loan Application <br /> 4. Please provide a brief description of the owner's existing water supply facilities and describe <br /> any existing operational or maintenance problems. Attach a map of the service area <br /> See Attached Addendum and Feasibility Study. A map of the service area is attached. <br /> For existing facilities indicate: <br /> Number of shareholders N/A or Number of customers served N/A <br /> Current Assessment per share$WA Number of shares N/A <br /> Number of acres irrigated N/A Water Right: CFS. <br /> Average water diverted per year: acre-feet. <br /> Part B.-Description of the Project <br /> 1. Name of the Project Smelter Pipeline Reservoir Enlargement <br /> 2. Purpose of this loan application. Check one. <br /> New project <br /> Rehabilitation or replacement of existing facility <br /> Enlargement of existing facility <br /> Emergency Repair <br /> Other(describe) <br /> 3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br /> storage restriction order from the State Engineer? YES a NO El <br /> 4. General location of the project. (Please include county, and approximate distance and direction <br /> from nearest town,as well as legal description,if known. <br /> Park County,CO,Section 13,Township 9 South,Range 78 West of the 6th P.M.approximately 2 miles east of the Town of <br /> Alma adjacent to Mosquito Creek. A map is attached in the Addendum. <br /> 5. Please provide a brief narrative description of the proposed project including purpose, need, <br /> facilities,type of water uses to be served and service area. Attach separate sheet,if needed. <br /> The Project is for rehabilitation and enlargement of the existing Smelter Pipeline Reservoir from 21 AF to 28 AF,including <br /> replacement of the inlet and outlet works and installation of a PVC liner. The attached Addendum provides the information <br /> regarding feasibility,need and types of water uses to be served. <br /> 6. Will the acquisition of additional water rights be necessary? YES NO_ D <br /> If YES,please explain. <br /> 2 <br />