My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150402 CT2015-090 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150402 CT2015-090 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2015 3:21:35 PM
Creation date
5/29/2014 11:41:37 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-090
C150402
Contractor Name
Ephraim Ditch Company
Contract Type
Loan
County
Rio Grande
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALTERNATIVE SELECTED --#3 <br /> OPINION OF TOTAL PROJECT COST <br /> Alternative#1—Not considered further <br /> Alternative#2—Not considered further <br /> Alternative#3— Remove and replace all existing structures =$202,478 as follows: <br /> Concrete core & diversion $ 67,000 <br /> 2 Slide gates $ 10,000 <br /> 1 Automated gate $ 25,000 <br /> 5 flumes @ $7,000 $ 35,000 <br /> 5 stilling wells @ $1,000 $ 5,000 <br /> 5 sites, measurement &telemetry $ 15,000 <br /> 1 Gateway node $ 7,000 <br /> Construction Subtotal $164,000 <br /> Feasibility Study $ 5,000 <br /> NRCS Engineering $ 15,000 <br /> Administration $ 12,000 <br /> District Telecom Match $ 5,478 <br /> Loan Origination Fee $ 1.000 <br /> TOTAL PROJECT COST $202,478 <br /> 13 Prepared by the Conejos Water Conservancy District, P.O. Box 550, Manassa,CO 81141 <br /> Per contract: Nicole V.Langley,Transforma Research&Design(www.transformaarants.com) <br />
The URL can be used to link to this page
Your browser does not support the video tag.