Laserfiche WebLink
ALTERNATIVE SELECTED --#3 <br /> OPINION OF TOTAL PROJECT COST <br /> Alternative#1—Not considered further <br /> Alternative#2—Not considered further <br /> Alternative#3— Remove and replace all existing structures =$202,478 as follows: <br /> Concrete core & diversion $ 67,000 <br /> 2 Slide gates $ 10,000 <br /> 1 Automated gate $ 25,000 <br /> 5 flumes @ $7,000 $ 35,000 <br /> 5 stilling wells @ $1,000 $ 5,000 <br /> 5 sites, measurement &telemetry $ 15,000 <br /> 1 Gateway node $ 7,000 <br /> Construction Subtotal $164,000 <br /> Feasibility Study $ 5,000 <br /> NRCS Engineering $ 15,000 <br /> Administration $ 12,000 <br /> District Telecom Match $ 5,478 <br /> Loan Origination Fee $ 1.000 <br /> TOTAL PROJECT COST $202,478 <br /> 13 Prepared by the Conejos Water Conservancy District, P.O. Box 550, Manassa,CO 81141 <br /> Per contract: Nicole V.Langley,Transforma Research&Design(www.transformaarants.com) <br />