Project Cost <br /> The project cost was determined based upon an estimate prepared by CH2MHi11, a quotation from the <br /> turbine supplier Gilkes, an estimate of interconnection costs from MPEI, and experience gained from <br /> construction of Carter Hydro. Table 2 illustrates the major components of the cost. <br /> Table 2—Project Cost Estimate <br /> Item Cost <br /> Base Civil Works Construction Cost $ 1,588,000 <br /> 10 % Overhead $ 159,000 <br /> 5% Profit $ 79,000 <br /> 5% Project Admin $ 79,000 <br /> Constructioin Subtotal $ 1,905,000 <br /> 15% Construction Contingency $ 286,000 <br /> Construction Total $ 2,192,000 <br /> CH2MHill Submittal Review & Design Support $ 30,000 <br /> Northern Water CM $ 100,000 <br /> Northern Water Install Assistance $ 100,000 <br /> MPEI Interconnection $ 340,000 <br /> Turbine/Generator/Control $ 2,033,000 <br /> Subtotal Project Cost $ 4,795,000 <br /> 5% Project Contingency $ 240,000 <br /> Total Project Cost to be Financed $ 5,035,000 <br /> In addition to the costs listed above, Northern Water has funded recent studies on the project including <br /> the following: <br /> • Feasibility Study by CH2MHi11, August 2011, $81,000. <br /> • Preliminary Design including detailed Computational Fluid Dynamics Modeling and Transient <br /> Analysis by CH2MHil1, October 2012, $54,000. <br /> • Powerhouse siting refinement by CH2MHi11, October 2013, $30,000. <br /> • In-Tunnel and Penstock Design by CH2MHi11, to be completed by June 2014, $97,000. <br /> • MPEI Power System Impact Study, January 2014, $18,000. <br /> Additionally, as part of the LOPP, Northern Water agrees to forward fund Reclamation for their review <br /> and administrative time. Thus far, Northern Water has provided$55,000 to Reclamation. Therefore, a <br /> total of$335,000 has been spent or committed thus far. It is anticipated that there will be approximately <br /> $200,000 to $250,000 of additional design expenses paid for by Northern Water prior to awarding the <br /> turbine procurement and construction contracts. Hence, the total of Northern Water contributions to the <br /> project outside of the anticipated loan proceeds is expected to be between $535,000 and $585,000. <br /> These expenditures will cover the 10% of the project cost not covered by the 90% covered by the project <br /> loan. <br /> 9 <br />