My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150172 Final Report
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150172 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2014 9:17:41 AM
Creation date
5/14/2014 9:17:17 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150172
Contractor Name
Union Ditch Company
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
water losses, and thus infiltration to the aquifer should be monitored. Based on some <br /> amount of operational experience and monitoring at the site(s), the site(s) should be <br /> further evaluated for its effectiveness in the recharge project. The evaluation may <br /> indicate for example that: (1) the site(s) should be enlarged because it is highly effective, <br /> (2) that the depth be increased to eliminate high evaporative losses, (3) that an <br /> additional site is more suitable to project goals and should be developed, or (4) it may <br /> indicate information that is valuable for the development of additional sites, such as a <br /> more effective measurement structure. <br /> Conclusions <br /> This report has identified and evaluated proposed recharge sites that may be used for <br /> purposes of providing well augmentation water sources to the South Platte River. A <br /> methodology for administering and managing the recharge project has also been <br /> presenting in this report, including measurement, operational procedures, and <br /> accounting. This report has also recommended a general implementation plan for the <br /> project. <br /> This report provided a preliminary estimate of probable initial costs for the development <br /> of the project. The conclusions of this report indicate that the potential for implementing <br /> a suitable and cost effective recharge plan for Union Ditch is quite feasible. <br /> Aqua Engineering, Inc. Recharge Project Potential <br /> February 17, 2004 - 15 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.