My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150399 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150399 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2015 7:59:11 AM
Creation date
5/12/2014 4:15:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-092
C150399
Contractor Name
Fulton Irrigating Ditch Company
Contract Type
Loan
County
Adams
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item Description Estimated Contingency Estimated Total <br /> No. Construction Engineering <br /> 1 Branch Ditch Diversion $ 225,000 $ 45.000 $ 35,000 $ 305,000 <br /> 2 River Gate Replacement $ 630,000 $ 126,000 $ 95,000 $ 851,000 <br /> 3 Trash Rack Cleaning System $ 795,000 $ 159.000 $ 120,000 $ 1,074,000 <br /> TOTAL $ 1,650,000 $ 330,000 $ 250,000 $ 2,230,000 <br /> IMPLEMENTATION SCHEDULE <br /> D&A is expected to complete the design with technical back-up for submittal to CWCB by <br /> September 2014. Once approval to proceed is obtained by the CWCB,construction will begin as <br /> soon as the canal is taken out of service beginning in November of 2014 and should be completed <br /> by March 15, 2015. <br /> PERMITTING <br /> All easements and rights-of-way have been arranged for. The Company is exempt from 404 <br /> permitting as confirmed by the Army Corps of Engineers. As requested by the Army Corps of <br /> Engineer, D&A will provided written notice of the project start date. An Adams County floodplain <br /> development permit will also be needed for this project. <br /> INSTITUTIONAL CONSIDERATIONS <br /> Entities that are, or may be, involved in the design,construction, and financing of the project <br /> include: <br /> • Fulton Irrigation Ditch Company; financing and project management <br /> • Colorado Water Conservation Board (CWCB); financing and construction <br /> • Deere&Ault Consultants, Inc., design and construction <br /> The Fulton Irrigation Ditch Company will be the lead for the financing, design and construction of <br /> the project and will be the entity entering into contracts and agreements with the various entities for <br /> the service provided by each. <br /> FINANCIAL ANALYSIS AND CREDIT WORTHINESS <br /> The Fulton is applying for a loan from the CWCB in maximum amount of$1,898,500.00. The <br /> actual or estimated amounts by entity are given below: <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.