Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> Introduction (Need for the Project) 3 <br /> Project Sponsor 3 <br /> Project Service Area and Facilities 3 <br /> Hydrology and Water Rights 4 <br /> Project Description and Alternatives 4 <br /> Selected Alternative 4 <br /> Cost Estimate 4 <br /> Implementation Schedule 5 <br /> Permitting 5 <br /> Institutional Considerations 5 <br /> Financial Analysis and Credit Worthiness 5 <br /> Alternative Financing Considerations 6 <br /> Collateral 6 <br /> Economic Analysis 7 <br /> Social and Physical Impacts 7 <br /> Conclusions 7 <br /> List of Tables <br /> Table 1 Estimated Project Cost <br /> List of Appendices <br /> Appendix A Map of Fulton Irrigation Ditch Company Service Area <br /> Appendix B Preliminary Plan Drawings <br /> • Figure No. 1: 30 Foot River Gate Replacement Concept Plan <br /> • Figure No. 2: Gantry Trash Rack Cleaning Concept Plan <br /> • Figure No. 3: Branch Ditch Diversion Reconstruction <br /> Appendix C CWCB Loan Application <br /> Q:\0161 Fulton Ditch Company\0161.041 Head Works and Improvements\Fulton CWCB FS\Fulton CWCB FS 32014.docx <br /> —1— <br />