My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150399 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150399 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2015 7:59:11 AM
Creation date
5/12/2014 4:15:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-092
C150399
Contractor Name
Fulton Irrigating Ditch Company
Contract Type
Loan
County
Adams
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FULTON IRRIGATING DITCH COMPANY <br /> RIVER GATE REPLACEMENT, <br /> TRASH RACK CLEANING SYSTEM AND <br /> BRANCH DITCH DIVERSION RECONSTRUCTION <br /> FEASIBILITY STUDY <br /> " weir <br /> s.•►- irn <br /> IRS <br /> Sponsored by the <br /> FULTON IRRIGATING DITCH COMPANY <br /> 25 South 4th Avenue <br /> Brighton, Colorado 80601-2029 <br /> In conjunction with the <br /> COLORADO WATER CONSERVATION BOARD <br /> D&A Job No. CG-0161.041.00 <br /> March 31, 2014 <br /> DEERE & A U L T FEASIBILITY STUDY APPROVAL <br /> CONSULTANTS, Purauent to Colorado Boucles adopted 37b- <br /> Longmont, 60-9121 Board, the <br /> In accordance date ..�hi5 FeasibilKy Study meets all <br /> 600 South Airport Road,Suite A-205 CWCB`'' h' e <br /> proval. <br /> Longmont,CO 80503 appil .l ` - <br /> (303)651-1468 • Fax(303)651-1469 /- <br /> www.deereault.com Data <br /> Signed <br />
The URL can be used to link to this page
Your browser does not support the video tag.