Laserfiche WebLink
FULTON IRRIGATING DITCH COMPANY <br /> RIVER GATE REPLACEMENT, <br /> TRASH RACK CLEANING SYSTEM AND <br /> BRANCH DITCH DIVERSION RECONSTRUCTION <br /> FEASIBILITY STUDY <br /> " weir <br /> s.•►- irn <br /> IRS <br /> Sponsored by the <br /> FULTON IRRIGATING DITCH COMPANY <br /> 25 South 4th Avenue <br /> Brighton, Colorado 80601-2029 <br /> In conjunction with the <br /> COLORADO WATER CONSERVATION BOARD <br /> D&A Job No. CG-0161.041.00 <br /> March 31, 2014 <br /> DEERE & A U L T FEASIBILITY STUDY APPROVAL <br /> CONSULTANTS, Purauent to Colorado Boucles adopted 37b- <br /> Longmont, 60-9121 Board, the <br /> In accordance date ..�hi5 FeasibilKy Study meets all <br /> 600 South Airport Road,Suite A-205 CWCB`'' h' e <br /> proval. <br /> Longmont,CO 80503 appil .l ` - <br /> (303)651-1468 • Fax(303)651-1469 /- <br /> www.deereault.com Data <br /> Signed <br />