My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150399 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150399 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2015 7:59:11 AM
Creation date
5/12/2014 4:15:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-092
C150399
Contractor Name
Fulton Irrigating Ditch Company
Contract Type
Loan
County
Adams
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Application <br /> 4. Please provide a brief description of the owner's existing water supply facilities and describe <br /> any existing operational or maintenance problems. Attach a map of the service area <br /> Diversion Dam and Headgates on the South Platte River at 100th Ave,with ditch works trending northward,north of Ft.Lupton. <br /> Existing river gates and Branch Ditch diversion gates need replacement,severe clogging at river diversion due to vegetative <br /> debris buildup on the trash racks. <br /> For existing facilities indicate: <br /> Number of shareholders 220 or Number of customers served <br /> Current Assessment per share$55 Number of shares 7,185 <br /> Number of acres irrigated 37,628 Water Right: 204.18 CFS. <br /> Average water diverted per year: 29,684 acre-feet. <br /> Part B.-Description of the Project <br /> 1. Name of the Project Fulton Irrigation Ditch Company River Gate Replacement,Trash Rack Cleaning System and Branch Ditch Diversion Reconstruction <br /> 2. Purpose of this loan application. Check one. <br /> New project <br /> Rehabilitation or replacement of existing facility <br /> Enlargement of existing facility <br /> Emergency Repair <br /> Other(describe) _ <br /> 3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br /> storage restriction order from the State Engineer? YES❑ NO <br /> 4. General location of the project. (Please include county, and approximate distance and direction <br /> from nearest town, as well as legal description, if known. <br /> The headworks for the Fulton Ditch are located In the NE%SE%Section 17,725,1167W,6th P.M.,Adams County,eta point approximately 2,815 feet south and 145 feet West <br /> of the Northeast corner of said Section 17 at approximatelyt 00th Avenue and the South Plane twenty-two(22)miles south of Brighton.and extends Northerly approximately 39 miles. <br /> 5. Please provide a brief narrative description of the proposed project including purpose, need, <br /> facilities,type of water uses to be served and service area. Attach separate sheet, if needed. <br /> Please see attached sheet. <br /> 6. Will the acquisition of additional water rights be necessary? YES F7 NO_r l <br /> If YES,please explain. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.