Laserfiche WebLink
CWCB Water Project Loan Application <br /> 7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br /> attorney(s). <br /> NAME ADDRESS and PHONE <br /> Brice Steele 25 South 4th Ave, Brighton, CO 80601 303-659-3171 <br /> Colby Hayden 600 South Airport Road, Bldg. A, Suite 205, Longmont, CO 80503 <br /> 8. List any feasibility studies or other investigations that have been completed or are now in <br /> progress for the proposed project. If so, submit one copy of the study with this application <br /> Fulton Irrigation Ditch Company, River <br /> 9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br /> construction costs, if known. <br /> Estimated Engineering Costs:$ $250,000 <br /> Estimated Construction Costs: $ 1,980,000 <br /> Estimated Other Costs: $ (land,water rights purchase,etc.) <br /> Estimated Total Costs: $2,230,000 <br /> f2 6)&7,0°0 F f P e� <br /> 10. Loan amount and terms you are requesting. e 9'0 ' <br /> Requested Loan Amount: S-1-7895-500700 (Usually 90%of est.Total Costs) <br /> Term (length)of loan: 30 years (Usually 10,20,or 30 years) <br /> Interest Rate: 2.45 % (Please call for our current rates) <br /> Part C.-Project Sponsor Financial Information <br /> Because the CWCB's Fund is a revolving fund, it is important that the project sponsor have the <br /> financial capacity to repay any loans made by the CWCB. The following information is needed to <br /> assist the CWCB in a preliminary assessment of the applicant's financial capacity. The project <br /> sponsor will submit the three most recent annual financial statements. <br /> 1. List any existing long-term liability (multi-year) or indebtedness that exceeds one thousand <br /> dollars. For example, bank loans, government agency loans, bond issues, accounts payable, etc. <br /> Include names and addresses of lenders, amounts, due dates and maturity dates. <br /> 3 <br />