Laserfiche WebLink
List of Tables <br /> Page No. <br /> 2-41 Alternative 9 Impacts to Environmental Resource Areas 2-71 <br /> 2-42 Alternative 9 Evaluation of Capability of Alternative to Meet the Purpose and Need 2-72 <br /> 2-43 Alternative 9 Summary of Results of the Technical and Economic Factors 2-73 <br /> 2-44 Alternative 10 Impacts to Environmental Resource Areas 2-75 <br /> 2-45 Alternative 10 Evaluation of Capability to Meet Purpose and Need 2-75 <br /> 2-46 Alternative 10 Summary of Results of the Technical and Economic Factors 2-76 <br /> 2-47 Summary of Significant Environmental Impacts of the Alternatives 2-83 <br /> 2-48 Summary of the Capability of Alternatives to Meet the Purpose and Need <br /> Requirements 2-85 <br /> 2-49 Summary of Technical and Economic Factors 2-89 <br /> 2-50 Refined Alternative 4 Structural and Non-Structural Components Depletions 2-97 <br /> 2-51 Refined Alternative 4 Summary of Water Sources and Amounts from Storage and <br /> Purchase of Water Rights 2-98 <br /> 2-52 Water Supply by Use for the Structural Component of Refined Alternative 4 2-99 <br /> 2-53 Total Costs Refined Alternative 4 2-123 <br /> 2-54 Summary of Average Annual Operating Costs For Full Project Operation Ridges <br /> Basin Dam and Reservoir,Durango Pumping Plant, and Ridges Basin Inlet Conduit 2-126 <br /> 2-55 Summary of Annual Operating Navajo Nation Municipal Pipeline 2-127 <br /> 2-56 Refined Alternative 6 Summary of Sources and Amounts of Water 2-131 <br /> 2-57 Future Water Use and Average Diversion and Depletion Summary for Refined ' <br /> Alternative 6 M&I Use at 50 Percent Efficiency 2-132 <br /> 2-58 Capital Costs Refined Alternative 6 2-145 <br /> 2-59 Comparison of Navajo Nation Municipal Pipeline Alternatives 2-154 <br /> 2-60 Alternative NNMP-1 Impacts to Environmental Resource Areas 2-155 <br /> 2-61 Alternative NNMP-1 Summary of Results of Technical and Economic Factors 2-155 <br /> 2-62 Alternative NNMP-2 Impacts to Environmental Resource Areas 2-156 <br /> 2-63 Alternative NNMP-2 Summary of Results of Technical and Economic Factors 2-157 <br /> 2-64 NNMP-3 Impacts to Environmental Resource Areas 2-158 <br /> 2-65 Alternative NNMP-3 Summary of Results of Technical and Economic Factors 2-158 <br /> 2-66 Refined Alternative 4 and Refined Alternative 6 Future Water Uses and Acreage <br /> Affected 2-160 <br /> 2-67 Refined Alternative 4 Approximation of Potential Acreage Impacted by Construction <br /> and Operation of Lateral Pipelines 2-161 <br /> 2-68 Refined Alternative 6 Acreage Impacted by Construction and Operation of <br /> Lateral Pipelines 2-162 <br /> 2-69 Comparison of Refined Alternative 4 and Refined Alternative 6 2-168 <br /> 3.1-1 Agricultural Land Assumptions Associated with Land Acquisition Under the Non- <br /> Structural Components 3-2 <br /> 3.2-1 Summary of Future Without Project(Baseline)Depletions in the San Juan River Basin 3-6 <br /> 3.2-2 Modeled Diversion and Depletion Summary for Refined Alternative 4 With All <br /> M&I Use at 50 Percent Efficiency 3-8 <br /> 3.2-3 Modeled Diversion and Depletion Summary for Refined Alternative 6M&I Use at 50 <br /> Percent Efficiency 3-15 <br /> 3.2-4 Mean,Minimum and Maximum Monthly Average Flow of the Animas River at Three <br /> Locations for Future Conditions with and without the Project 3-21 <br /> 3.2-5 Mean Monthly Flows for the San Juan River at Four Corners,New Mexico <br /> (USGS Gage)with Refined Alternative 4 and without(Baseline Condition)Project <br /> for the Modeled Period 1929-1993 3-24 <br /> xxiii <br />