My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150307 Final Supplimental Impact Statement
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150307 Final Supplimental Impact Statement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2014 12:59:10 PM
Creation date
4/8/2014 3:04:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150307
Contractor Name
Animas La Plata
Contract Type
Loan
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
List of Tables <br /> Page No. <br /> 1-1 Provisions of the Colorado Ute Indian Water Rights Settlement Act 1-6 <br /> 1-2 Administration Proposal Water Allocations for the Structural Components of the <br /> ALP Project 1-8 <br /> 1-3 List of ALP Project Alternatives 1-11 <br /> ' 2-1 Summary of Future Uses of M&I Water by the Navajo Nation,ALPWCD,and SJWC . . . 1-2 <br /> 2-1 Summary of Future Uses of M&I Water by the Navajo Nation,ALPWCD,and SJWC . . . 2-2 <br /> 2-2 Summary of Future Uses of ALP Project Water by Colorado Ute Tribes and Other <br /> II <br /> Project Beneficiaries 2-9 <br /> iii_; 2-3 Potential Water Sources to Meet Use Requirements 2-14 <br /> :"; 2-4 Summary of Structural Alternatives to Ridges Basin Dam and Reservoir 2-17 <br /> Il D' <br /> I' - 2-20 <br /> , 2-5 Summary of Alternatives <br /> I'f 2-6 Alternative 1 Structural Component Allocation of ALP Project Water for <br /> 'L t <br /> ,II' <br /> I ,'i, M&I Purposes 2-26 <br /> II e <br /> 2-7 Basin-Wide Firm(Dry Year)Depletion Factors 2_28 <br /> III <br /> 2-8 Lands Potentially Available for Purchase 2-29 <br /> III 2-9 Summary of Estimated Irrigated Acreage to be Acquired for Water Rights Acquisition <br /> ,i , Program to Satisfy 13,000 afy Depletion Non-Structural Component 2-30 <br /> II.', 2-10 Alternative 1 Impacts to Environmental Resource Areas 2-33 <br /> 2-11 Alternative 1 Evaluation of Capability of Alternative to Meet the Purpose and Need 2-34 <br /> II' 2-12 Alternative 1 Summary of Results of the Technical and Economic Factors 2-34 <br /> 2-13 Alternative 2 Impacts to Environmental Resource Areas <br /> 2-35 <br /> i 2-14 Alternative 2 Evaluation of Capability of Alternative to Meet the Purpose and Need 2-36 <br /> 2-15 Alternative 2 Summary of Results of the Technical and Economic Factors 2-36 <br /> ', 2-16 Alternative 3 Impacts to Environmental Resource Areas 2-37 <br /> 2-17 Alternative 3 Evaluation of Capability of Alternative to Meet the Purpose and Need 2-38 <br /> i ';` 2-18 Alternative 3 Summary of Results of the Technical and Economic Factors 2-38 <br /> , r <br /> 2-I9 Alternative 4 Impacts to Environmental Resource Areas 2-39 <br /> 2-20 Alternative 4 Evaluation of Capability of Alternative to Meet the Purpose and Need 2-40 <br /> 2-21 Alternative 4 Summary of Results of the Technical and Economic Factors 2-40 <br /> • <br /> 2-22 Alternative 5 Allocation of ALP Project Water 2-41 <br /> 2-23 Alternative 5 Impacts to Environmental Resource Areas 2-42 <br /> 2-24 Alternative 5 Evaluation of Capability of Alternative to Meet the Purpose and Need 2-43 <br /> 2-25 Alternative 5 Summary of Results of the Technical and Economic Factors 2-43 <br /> 1 2-26 Allowable Depletions Specified Under the 1986 Settlement Agreement 2-44 <br /> 2-27 Water Use Scenario 2 Projected M&I Depletions by River Basins 2-47 <br /> 2-28 Alternative 6-Non Structural Summary of Appraisal-Level Estimate of Irrigated <br /> Acreage to be Required and Required Storage for Water Rights Acquisition Program 2-48 <br /> 2-29 Estimate of Firm or Assured Water Supply for M&I Uses 2-54 <br /> ,# 2-30 Appraisal-Level Cost Estimate Irrigation Systems Improvement 2-57 <br /> 2-31 Alternative 6 Impacts to Significant Environmental Resource Areas 2-60 <br /> 2-32 Alternative 6 Evaluation of Capability of Alternative to Meet the Purpose and Need 2-62 <br /> 2-33 Alternative 6 Results of the Evaluation of the Technical and Economic Factors 2-63 <br /> 2-34 Alternative 7 Impacts to Environmental Resource Areas 2-64 <br /> ' 2-35 Alternative 7 Evaluation of Capability of Alternative to Meet the Purpose and Need 2-65 <br /> 2-36 Alternative 7 Summary of Results of the Technical and Economic Factors 2-65 <br /> g' 2-37 Alternative 8 Impacts to Environmental Resource Areas 2-66 <br /> 2-38 Alternative 8 Evaluation of Capability of Alternative to Meet the Purpose and Need 2-67 <br /> . 2-39 Alternative 8 Summary of Results of the Technical and Economic Facto 2-68 <br /> 2-40 Summary of Revenue Stream from Opportunity Costs 2-71 <br /> i <br /> ' 'i` xxii <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.