My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153686 Final Deliverable
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C153686 Final Deliverable
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2014 12:57:40 PM
Creation date
4/8/2014 2:46:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153686
Contractor Name
Red Mesa Ward Reservoir and Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12.7 Project Costs: The estimated costs are shown on Table 6. The total estimated cost in 1995 <br /> is $2,725,000. An additional amount of$275,000 is added for inflation based on 5%per year for <br /> two years, for a total project cost of$3,000,000. The cost per acre-foot of 1,872 acre-feet of <br /> average supply is $1,600. The cost estimate needs significant updating and is no longer <br /> appropriate as of August, 2001. <br /> The annual operation and maintenance costs will be the same as it has been historically which is <br /> about$5,000 per year. <br /> 12.8 Implementation Tasks: The following activities are planned in preparation for construction <br /> designs: <br /> * Preparation and submission of a 404 Permit application to the Corp of Engineers and <br /> subsequent negotiations on wetland and endangered fish species. <br /> * Coordination with involved entities. <br /> * Negotiations to obtain the necessary lands and right-of-way. <br /> * Marketing water developed by the enlargement. <br /> * Preparation of a draft contract between the CWCB and Company. <br /> * Completion of any additional information required by the CWCB. <br /> The above activities should be completed or progressing to completion without any major <br /> problems, before proceeding to the construction activities. The following are preconstruction <br /> activities. <br /> * complete and ratify contract between CWCB and Company. <br /> * Obtain aerial topography of dam site(2 foot contours, 1" = 50') and reservoir <br /> basin(5 foot contours, 1" = 100'). <br /> * Conduct additional geotechnical evaluations. <br /> * Prepare designs and specifications and submit to State Engineer. <br /> * Following review and comments, approval of designs and specifications. <br /> * Obtain title to necessary land. <br /> 26 <br />