My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150094 Application
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150094 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:24:40 PM
Creation date
4/4/2014 11:53:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150094
Contractor Name
La Plata Water Conservancy District
Contract Type
Grant
County
La Plata
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Grant Application - CWCB Construction Fund <br /> Form Revised December 16,1999 <br /> 7. Please list the names and addresses of any technical or legal consultants retained to <br /> represent the applicant or to conduct investigations for the proposed project or study: <br /> NAME ADDRESS and PHONE <br /> TECHNICAL: <br /> Eric A. Bikis, P.G. Wright Water Engineers, Inc. <br /> 1666 N. MainAve. Ste. C <br /> Durango, CO 81301 <br /> (970) 259-7411 <br /> LEGAL: <br /> Janice C. Sheftel Maynes Bradford Shipps & Sheftel, LLP <br /> P.O. Box 2717 <br /> Durango, CO 81302 <br /> (970) 247-1755 <br /> 8. List any feasibility study or scope of work that has been completed or is now in progress <br /> for the proposed project or study. (Please submit one copy with this application): <br /> A. Western La Plata County Water Management and Conservation Plan (copies provided <br /> to CWCB previously) Note: This plan includes a preliminary description of the <br /> hydrology study and reservoir site evaluations that together constitute the feasibility study <br /> that is the subject of this application. <br /> B. Feasibility Study Workplan Note: This project was funded with a grant from the <br /> CWCB and has been completed. <br /> 9. What is the estimated cost of the project or study? Please include estimated Planning, <br /> Engineering, and Construction costs, if known: <br /> Estimated Planning/Study Costs: $ 444,645 <br /> Estimated Engineering Costs: $ <br /> Estimated Construction Costs: $ <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.