My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Report & Environmental Impact
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
Planning Report & Environmental Impact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2014 3:02:32 PM
Creation date
4/1/2014 10:37:18 AM
Metadata
Fields
Template:
Loan Projects
Contractor Name
Navaho-Gallup Water Supply Project
Contract Type
Loan
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Executive Summary <br /> Gallup via diversions from the San Juan River in northern New Mexico. The Navajo <br /> Nation, city of Gallup, and the Jicarilla Apache Nation are part of the project Steering <br /> Committee that assisted in preparation of portions of this document. <br /> Navajo Nation communities and the city of Gallup rely on a rapidly depleting <br /> groundwater supply that is inadequate to meet present needs and anticipated growth. <br /> Other water sources are needed to meet current and future M&1 demands of more than <br /> 43 Navajo chapters, including the communities of Fort Defiance and Window Rock in <br /> Arizona, the city of Gallup, and the Teepee Junction area of the Jicarilla Apache Nation. <br /> The proposed project would deplete approximately 35,893 acre–feet of water annually <br /> from the San Juan River(Navajo Nation–27,193 acre-feet, Jicarilla Apache Nation– <br /> 1,200 acre-feet, city of Gallup–7,500 acre-feet). Based on the expected populations in <br /> the year 2040, the proposed project would serve approximately 203,000 people in <br /> 43 chapters in the Navajo Nation, 1,300 people in the Jicarilla Apache Nation, and <br /> approximately 47,000 people in the city of Gallup. <br /> PLANNING PROCESS <br /> • <br /> Project planning has been intermittent over the past 40 years. Drawing from past analysis <br /> and projecting water needs and environmental conditions into the next 40 years have <br /> provided the basis for the planning work described in this report. <br /> A project Steering Committee included representatives from the Navajo and Jicarilla <br /> Apache Nations, city of Gallup, State of New Mexico, Bureau of Indian Affairs (BIA), <br /> Indian Health Service (IHS),Navajo Tribal Utility Authority (NTUA), Northwest <br /> New Mexico Council of Governments, and Reclamation. The Steering Committee was <br /> formed in the early 1990s to guide the direction of this proposed project,provide <br /> technical analysis, support public involvement,provide political background, and conduct <br /> overall project coordination. Reclamation has provided planning, engineering, and <br /> environmental expertise to this committee. <br /> Funding for project planning has mostly been through annual congressional write-in <br /> funds and cost sharing by the Navajo and Jicarilla Apache Nations and the city of Gallup. <br /> The level of analysis—appraisal verses feasibility level work—has been tailored to stay <br /> within the funds available. <br /> To expedite planning and environmental steps, it was decided that this document would <br /> be a combined PR/DE1S. This document complies with the Economic Principles and <br /> Guidelines for Water and Related Land Resources Implementation Studies (Principles <br /> and Guidelines) and NEPA. <br /> S - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.