My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2011
CWCB
>
Publications
>
DayForward
>
Finance Committee Meeting 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2015 10:34:49 AM
Creation date
3/17/2014 10:27:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/2011
Description
2011 Finance Sub-Committee Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Project Construction Program—Project Data <br /> Applicant: Division of Water Resources and Colorado Water Conservation Board <br /> Project Name: Satellite-linked Monitoring Project Type: DWR Stream Gaging <br /> System and Stream Gage Refurbishment program <br /> County: Statewide Drainage Basin: Water Source: N/A <br /> Statewide Drainage Basins <br /> Total Study Cost: $300,000 Funding Sources: CWCB <br /> CWCB Investment: Interest Rate: N/A Term: N/A <br /> $300,000 <br /> This project entails the continued, long-term operational viability of the State Satellite Linked <br /> Monitoring System and Stream Gage Refurbishment Program,which is administered by the <br /> Division of Water Resources (DWR). This program encompasses over 500 satellite stream <br /> gaging stations which require continued replacement of outdated data collection platforms, <br /> upgrades to transmission components, and refurbishment of the associated infrastructure. In <br /> addition, many existing gaging stations need to be modified to provide critical stream flow data <br /> for flood warning and low flow monitoring. Changes in technology, which will ultimately <br /> increase reliability and real time data <br /> '' ", transmission rates,will require the <br /> 'wE = DWR to continue to upgrade the system <br /> in the future. The costs associated with <br /> the continued refurbishment and <br /> e viability of the system is <br /> approximately$300,000 per year. <br /> thas- <br /> _. ` <br /> f <br /> Crystal River DM R/C'N'CB Satellite Gage <br /> «'a <br /> Purgatoire River(ti,Fishers Crossing <br /> DWRICWCB Compact Gage <br />
The URL can be used to link to this page
Your browser does not support the video tag.