My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2011
CWCB
>
Publications
>
DayForward
>
Finance Committee Meeting 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2015 10:34:49 AM
Creation date
3/17/2014 10:27:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/2011
Description
2011 Finance Sub-Committee Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
estimated cost column shows estimated refurbishment costs at gages which could not be completed in <br /> FY10-11 which are carried over to the current fiscal year. <br /> Table 1. CO DWR Streamgage Refurbishment Projects, FY10-11. <br /> Gage Actual Cost Est. Cost Description <br /> South Platte at Denver $1,000.00 gage shelter and instrument shelf repairs <br /> South Boulder Creek at Eldorado Springs $4,310.96 install bank-operated cableway unit procured in FY09 <br /> South Platte River nr Atwood $2,160.00 bank stabilization/rip rap <br /> M iddle St Vrain Creek at Peaceful Valley $4,880.00 rock vane control <br /> S.Platte R.above 11-mile Reservoir nr Hartsel $5,071.10 re-build gage shelter <br /> Fall River nr Idaho Springs $800.00 channel work above control <br /> N.St.Vrain Creek nrAllenspark $110.13 cantilever gage <br /> Boulder Creek nearOrodell $329.00 move boulders in channel <br /> North Fk Republican River $460.00 pump rental to dewaterchannel for culvert armoring <br /> Arkansas River below Catlin Dam near Fowler $2,515.00 guard rails on right side A-frame platform <br /> Huerfano River nr Redwing $4,276.50 install bank-operated cableway unit procured in FY09 <br /> Arkansas River above Pueblo $500.00 replace cable,clips,thimbles,backstays <br /> Arkansas River near Wellsville $581.86 $418.14 replace cable,turnbuckle,clips,thimbles <br /> Arkansas River at Portland $944.38 move orifice line u.s.,install OG <br /> Arkansas River at Nepesta Bridge $21152 install radar gage <br /> Lake Creek bel Twin Lakes $200.00 install ADCP clothesline <br /> South Arkansas bel Tennasse Ditch $2,836.00 bank stabilization <br /> Horse Creek at Hwy 194 $250.00 bank work and stabilization at control REW <br /> Arkansas River at Granite $126.00 replace wood deck at shelter <br /> Wild Cherry Creek nrCrestone $357.47 control,new valves <br /> Willow Creek near Crestone $854.63 New well,inlets,shelter placement(old USGS shelter) <br /> South Crestone Cr nr Crestone $362.14 New well,inlets,shelter placement(old USGS shelter) <br /> Los Pinos River nr Ortiz(compact gage) $378.46 install ADCP clothesline <br /> San Antonio River at Ortiz(compact gage) $1,278.67 channel work,rock control,cableway <br /> Trinchera Creek above Turner's Ranch $4,922.00 procure bank-operated cableway unit <br /> Deadman Creek nr Crestone $1,870.39 move gage,build new control <br /> Rito Alto Creek nrCrestone $1,256.75 build new control <br /> Flush valve replacement $483.00 replace flush valves at several gages <br /> Mountain Home Reservoir $72.48 orifice line <br /> Rio Grande and Pine River nr Del Node $115.90 outside staff gages <br /> OG for nine different Div 3 gages $872.95 Staff gage sections and hardware for 9 Div 3 gages <br /> Gunnison River bel Redland Canal $2,953.00 remove cottonwood tree near gage <br /> Cow Creek near Ridgway Reservoir $220100 us channel and bank work,boulder vanes <br /> South Canal near M ontrose $4,922.00 procure bank-operated cableway unit <br /> Uncompahgre River above South Canal $100.56 install OG,extend orifice line <br /> Uncompahgre River below South Canal $568.05 install shelter,sat mon eqmt,radar sensor on bridge rail,WWG <br /> Gunnison River bel Gunnison Tunnel $284.83 refurbish gage shelter roof and paint <br /> Roubideau Creek near Delta $1,900.00 remove concrete control <br /> Muddy Creek above Paonia Reservoir $427.69 ADCP clothesline pulley setup <br /> Fryingpan River near Thomasville $4,922.00 procure bank-operated cableway unit <br /> Crystal River at Fish Hatchery near Carbondale $49.03 install concrete mass anchor for orifice line <br /> Blue River at Hwy 9 bel Breckenridge $10151 supplies for temp orifice line <br /> Williams Fork at Mouth nr Hamilton $28.56 anchor orifice line;install radar gage on bridge rail <br /> Michigan River at Walden $1,500.00 install new temporary gage(CFB) <br /> Talamantes Creek $1,311.84 install new gage at 2 ft PF(wet well) <br /> Florida R.above Lemon Reservoir $100.00 install orifice line and conduit;repairs to concrete control <br /> Navajo River at Banded Peak Ranch $37.28 refurbish wood gage house and stain <br /> Little Oso $164.20 paint shelter,new shingles on roof <br /> Four Div 7 gage shelters $130.00 install door thresholds to seal out mice <br /> Div 7 survey monuments $100.00 install new survey B M s at several gages <br /> La Plata River near Hesperus $4,922.00 procure bank-operated cableway unit <br /> Salt Creek nr Oxford $37.84 concrete repair <br /> Pine River bel Vallecito Reservoir $200.00 concrete around A-frame pad <br /> Orifice line for CFB projects $42162 <br /> M isc.supplies and equipment $1,142.01 <br /> Total $69,032.30 $4,268.14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.