My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lafayette_NozzleRplcmt_ApprvlLtr
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Lafayette_NozzleRplcmt_ApprvlLtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:19:34 PM
Creation date
3/11/2014 8:42:41 AM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Implementation Grant
Contract/PO #
OE PDA 14-86
Applicant
City of Lafayette
Project Name
Pre-Rinse Spray Nozzle Replacement Program
Title
Approval Letter
Date
2/11/2014
County
Boulder
Water Efficiency - Doc Type
Approval Letter
Document Relationships
Lafayette_NozzleRplcmt_50%PR
(Message)
Path:
\Water Efficiency Grants\Day Forward
Lafayette_NozzleRplcmt_75%PR
(Message)
Path:
\Water Efficiency Grants\Day Forward
Lafayette_NozzleRplcmt_Applic
(Message)
Path:
\Water Efficiency Grants\Day Forward
Lafayette_NozzleRplcmt_Invoices
(Message)
Path:
\Water Efficiency Grants\Day Forward
Lafayette_NozzleRplcmt_PO
(Message)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Name of Applicant: try LA-FANI t <br /> Date Received: -7 7-42 t 3 <br /> Grant Amount: t,oS�l .2S" <br /> HB 05-1254: Evaluation Checklist for Entities <br /> For Covered Entity Applicant: Yes No Comments: <br /> Is the applicant a covered entity? <br /> Does the covered entity have a state approved water conservation plan in <br /> accordance with statutory revision 37-60-126? (HB 04-1365)? hPtiwvtn <br /> (If answered no to the above question)then, Does the covered entity have <br /> a locally adopted water conservation plan with defined water saving <br /> goals? <br /> Did the applicant provide a written statement from the entity's governing <br /> board, stating the entity's commitment to the project and the entity's ft, 9 <br /> commitment to implementing long-term water saving measures and V <br /> programs (w/authorized signature)? <br /> Did the applicant provide a cover letter with the entity's: name, contact <br /> information, and a signature of an individual with the authority to commit <br /> the resources of the entity? <br /> Did the applicant provide a list of people and/or organizations that will be <br /> involved in assisting with the grant project(list of who will be utilizing <br /> the grant money)? <br />• <br /> Characterizing Water System: <br /> Did the entity provide their annual retail water demand(Metered Water 4 <br /> Use) for the past five years (in acre ft. or million gallons)? <br /> Did the entity identify their retail water delivery(Distributed Water) for / 4 <br /> each of the past five years (in acre feet or million gallons)? <br /> (Not required, but preferred), Did the applicant provide information <br /> characterizing past water use by sector, (e.g. residential, commercial, and Pc. 4 <br /> industrial) and the source (e.g. surface water, groundwater, etc). <br /> Did the entity provide current(and if available past)per capita water use <br /> for the last five years and the basis for this calculation? <br /> Did the entity provide their past, current, and predicted future population g- _ 20 ls <br /> served by the entity, (and the source of this information)? <br /> Did the entity state the water savings that was accomplished in the past <br /> five years through water conservation efforts? •'s4- AF <br /> Did the entity state water savings goals to be achieved through the tG s, 3,ra I Ar <br /> implementation of the "project"? ■ sMn n/y e A <br /> Adequacy, Stability, and reliability of the entity's water system <br /> *to be measured and examined by staff through analysis ` P6 <br /> Description of Project: <br /> Did the applicant write a paragraph stating the purpose and the primary <br /> features of the project? ✓ <br /> Did the applicant provide a detailed narrative (description) of tasks to be <br /> performed with grant monies (stating how grant money will be used to ✓ P�. 1 <br /> achieve project goals)? *(a"scope of work" can combine this item with <br /> the timeline described below) <br />
The URL can be used to link to this page
Your browser does not support the video tag.