My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153642 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C153642 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:51:51 AM
Creation date
3/5/2014 9:20:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153642
Contractor Name
Colorado River Water Conservation District
Contract Type
MOU
County
Garfield
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br /> Colorado Water Conservation Board ,"',,� <br /> pp Cpl q. <br /> Department of Natural Resources <br /> 1313 Sherman Street,Room 721 ye _ `r <br /> Denver,Colorado 80203 �o <br /> Phone:(303)866-3441 l �f <br /> FAX:(303)866-4474 ...!87 • <br /> www.cwcb.state.co.us <br /> Bill Owens <br /> Governor <br /> Greg E.Watcher <br /> MEMORANDUM Executive Director <br /> Rod Kuharich <br /> TO: File CWCB Director <br /> Dan McAuliffe <br /> FROM: Mike Serlet, P.E., Chief Deputy Director <br /> Water Supply Planning and Finance Section <br /> DATE: May 1, 2005 <br /> SUBJECT: Colorado River Water Conservation Board <br /> Feasibility Study Loan <br /> Contract#C153642; Dated June 18, 1993 <br /> I spoke with Mr. Dan Birch, P.E., Project Development Manager of the Colorado River Water <br /> Conservation District, who manages the planning and construction of all new projects within the <br /> District, to determine that the Yampa River Basin project has not progressed past the feasibility study <br /> that was completed in May 1995. <br /> The project is located on the mainstem of the Yampa River downstream of Craig and upstream of <br /> Dinosaur, Colorado. <br /> As of the date,the project to enlarge the Elkhead Dam and Reservoir by the Colorado River Water <br /> Conservation District has not been completed; nor has any work beyond the completion of the project <br /> feasibility been completed. <br /> Therefore, the feasibility study contract#C153642 is closed and repayment will not be required since <br /> the project has not been constructed during the initial 10 year period after the date of the contract. <br /> Cc: Steve Biondo,Section B Accountant <br /> Flood Protection •Water Supply Planning and Finance •Stream and Lake Protection <br /> Water Supply Protection •Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.