My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150188 Legal Corespondance
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150188 Legal Corespondance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:08:46 AM
Creation date
3/4/2014 11:35:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150188
Contractor Name
Bull Creek Reservoir
Contract Type
Loan
County
Mesa
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> DAM NAME: BULL CREEK#5 Page 2 DAM I.D.:720116 DATE. 7/26/2006 <br /> (.1 EXISTINGINSTRUMENTATIONFOUND [1(110)NONE k(111)GAGE ROD ❑(112)PIEZOMETERS H(113)SEEPAGE WEIRS / FLUMES X U <br /> Z 114)SURVEY MONUMENTS 0 (115)OTHER A Z <br /> ❑( outlet flume p <br /> cc <br /> 0 MONITORING OF INSTRUMENTATION 0 (116)NO ❑(117)YES PERIODIC INSPECTIONS BY: ❑(118)OWNER ❑(119)ENGINEER o a o O <br /> .�. D T R .: <br /> Z, a Z. <br /> p O <br /> E <br /> PROBLEMS NOTED: ❑(60 NONE ❑ (61)ACCESS ROAD NEEDS MAINTENANCE ❑ (62)CATTLE DAMAGE <br /> U CC 5(63)BRUSH ON UPSTREAM SLOPE,CREST,DOWNSTREAM SLOPE, TOE 5(64)TREES ON UPSTREAM SLOPE, CREST,DOWNSTREAM SLOPE, Q G A RUM <br /> Z— 0 0 ZQ <br /> dQ(65)RODENT ACTIVITY ON UPSTREAM SLOPE, CREST,DOWNSTREAM SLOPE, TOE ❑(66)DETERIORATED CONCRETE- FACING,OUTLET SPILLWAY 0 E 0 .10. <br /> ZW D 7 R ZW <br /> W'DC n(67)GATE AND OPERATING MECHANISM NEED MAINTENANCE ❑(68)OTHER A ILI CC <br /> Z E Z Z <br /> 1QQ QQ <br /> G 2 <br /> Dam is in generally acceptable condition at this time. However,the irregular outlet configuration and continued <br /> , erosion of the steep downstream slope are dam safety concerns. The inadequate spillway capacity is a major `n <br /> Qo concern. a° <br /> Dc~ wo <br /> wo oZ <br /> z <br /> %-10 Based on this Safety Inspection and recent file review,the overall condition is determined to be: 0 <br /> (71)SATISFACTORY Q(72)CONDITIONALLY SATISFACTORY ❑(73)UNSATISFACTORY <br /> ITEMS REQUIRING ACTION BY OWNER <br /> TO IMPROVE THE SAFETY OF THE DAM <br /> 2 5 m MAINTENANCE•MINOR REPAIR•MONITORING <br /> Ayv <br /> xi= ❑(80)PROVIDE ADDITIONAL RIPRAP: <br /> C n 4 <br /> y o (81)LUBRICATE AND OPERATE OUTLET GATES THROUGH FULL CYCLE at least yearly <br /> v f v 3 0(82)CLEAR TREES AND/OR BRUSH FROM: crest,slopes,toe <br /> v 0 k <br /> O q (83)INITIATE RODENT CONTROL PROGRAM AND PROPERLY BACKFILL EXISTING HOLES: <br /> • m } N O (84)GRADE CREST TO A UNIFORM ELEVATION WITH DRAINAGE TO THE UPSTREAM SLOPE: <br /> a a a •• <br /> rn g (85) PROVIDE SURFACE DRAINAGE FOR: <br /> ,-(y 5 ❑• (86)MONITOR: <br /> .;%O£e c lA• (87)DEVELOP AND SUBMIT AN EMERGENCY PREPAREDNESS PLAN: Existing plan is 6 years old and outdated <br /> N° N a G (88)OTHER clear driftwood from upstream slope <br /> o 2 o 0(89)OTHER clear obstructions from spillway channel <br /> Al . N'} ENGINEERING•EMPLOY AN ENGINEER EXPERIENCED IN DESIGN AND CONSTRUCTION OF DAMS TO: (Plans and Specifications must be approved by State Engineer prior to construction. <br /> • o N El(90) PREPARE PLANS AND SPECIFICATIONS FOR REHABILITATION OF THE DAM: <br /> c O C ` ❑(91)PREPARE AS-BUILT DRAWINGS OF: <br /> o m <br /> ▪ O E El�a E (92)PERFORM A GEOTECHNICAL INVESTIGATION TO EVALUATE THE STABILITY OF THE DAM: <br /> a a`,sr. (93)PERFORM A HYDROLOGIC STUDY TO DETERMINE REQUIRED SPILLWAY SIZE: <br /> .▪?1;s <br /> 2 0 `, (94)PREPARE PLANS AND SPECIFICATIONS FOR AN ADEQUATE SPILLWAY:by 12/31/2007 <br /> c n a 2 ❑(95)SET UP A MONITORING SYSTEM INCLUDING WORK SHEETS,REDUCED DATA AND GRAPHED RESULTS: <br /> Ti <br /> m y O 3 (96) PERFORM AN INTERNAL INSPECTION OF THE OUTLET: <br /> EC.CO <br /> • n ❑(97)OTHER: <br /> ~ +0 3 0 El(98)OTHER: <br /> 7(99)OTHER: <br /> SAFE STORAGE LEVEL RECOMMENDED AS A RESULT OF THIS INSPECTION <br /> ▪(101) FULL STORAGE _ FT.BELOW DAM CREST <br /> n(102)CONDITIONAL FULL STORAGE FT.BELOW SPILLWAY CREST <br /> ❑(103)RECOMMENDED RESTRICTION _ FT.GAGE HEIGHT <br /> NO STORAGE-MAINTAIN OUTLET FULLY OPEN <br /> ❑(104)CONTINUE EXISTING RESTRICTION <br /> REASON FOR RESTRICTION <br /> ACTIONS REQUIRED FOR CONDITIONAL FULL STORAGE C^"^''T''"'r^^T^^"""T T" ^^"T"'^T"'^`^ <br /> • <br /> omplete maintenance and engineering items indicated above. Note that plans for an adequate spillway(item 94)must be <br /> ompleted by the end of 2007. <br /> Engineers Owners <br /> Signature Signature DATE: <br /> INSPECTED BY OWNER/OWNER'S REPRESENTATIVE pp 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.