My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150384 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150384 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:57:53 AM
Creation date
2/26/2014 11:57:53 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150384
Contractor Name
Davidson Ditch and Reservoir Company
Contract Type
Loan
Water District
6
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Emergency Loan Application and Feasibility Study The Davidson Ditch and Reservoir Co <br />Page 4 of 4 <br /> <br />Financial Analysis <br /> The Davidson Ditch and Reservoir Company has $0.00 in existing debt. <br /> <br />The Davidson Ditch and Reservoir’s sources of income include: Annual Assessments <br /> <br />Schedule <br /> Construction of the Project is expected to commence Nov 2013. Project completion is estimated <br />to occur by April 2014. <br /> <br />Economic, Social, and Environmental Effects <br /> Loss of Municipal Use Water supplies for Lafayette, Louisville, Boulder and Boulder County. <br />Loss of Agricultural water for all shareholders. <br />Loss of Recreational water for Burke, Waneka and Hecla Lakes. <br /> <br />Permits <br /> See attached “EZ Proposal 13-10-21.pdf” <br />
The URL can be used to link to this page
Your browser does not support the video tag.