Emergency Loan Application and Feasibility Study BTPR Ditch Co. <br />for additional flows if in the future an entity in our delivery system would require additional <br />water. <br />Cost Estimate <br />The Project cost estimate, provided by Doug Seely, PE is $800,000 and is further broken down <br />as follows: <br />Task <br />Cost <br />Current <br />Balance <br />$40,000 <br />-Design <br />0 <br />-Permitting <br />Construction <br />$640,000 <br />Other <br />0 <br />Contingency <br />$120,000 <br />Total <br />$800,000 <br />BTPR Ditch Co is applying for a loan not to exceed $800,000 <br />(Note: Depending on project scope, this may need to be an Engineer's Estimate of Probable Cost <br />or a contractor's estimate. We understand damage assessments may still be ongoing and some of <br />these cost will be rough estimates. Depending on project scope, a more detailed cost analysis <br />may be required prior to contracting.) <br />Financial Analysis <br />The BTPR Ditch has $9,267.01 in existing debt as summarized below: <br />Lender <br />Original <br />Balance <br />Current <br />Balance <br />Annual <br />Payment <br />Maturity <br />Date <br />Collateral <br />Kielian Const. Co. <br />$37,112.00 <br />$9,267.01 <br />$10,000.00 <br />06 -31- <br />2014 <br />Unsecured <br />The BTPR Ditch Co. sources of income include: <br />Note: Be sure to attach <br />• Two years of financial statements (required) <br />• Shareholder list (showing owner name, # of shares owned, and identify each owner as <br />agricultural or municipal) <br />• Articles of IncorporationBy -laws <br />Schedule <br />Construction of the Project is expected to commence January, 2014. Project completion is <br />estimated to occur by May 2014. Any delay beyond this time frame will result in crop losses for <br />