My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150370 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150370 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2015 4:27:28 PM
Creation date
2/26/2014 11:53:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-008
C150370
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Emergency Loan Application and Feasibility Study [LEFT HAND DITCH COMPANY] Page | 7 <br /> <br />• Management responsibility for this site resides with the Left Hand Water District. <br />Consequently the Company is not including this site in its financial estimate for restoring <br />facilities and is not requesting loan moneys to assist with repairing this site. <br /> <br />Table Mountain Ditch <br />• Head gate and diversion dam is destroyed <br />• Strucutre will need to be removed and replaced <br />• Left Hand Creek is presently flowing approximately /4 mile to the south east. The channel <br />needs to be restored in this area to restore service to the ditch. <br />• Approximately 1,500 linear feet of debris removal & stabilization to Left Hand Creek is <br />needed upstream from the diversion to restore service to the ditch. <br />• Approximately 200 linear feet of the ditch needs repair. <br />• Approximately 300 linear feet of the debris removal needed within the ditch <br /> <br />Bader Ditch <br />• Structure (headgate and diversion dam) was completely obliterated and is missing. Entire <br />structure will need replacement. <br />• Because of the close proximity of the Bader Ditch to the Table Mountain Ditch, all of the <br />channel work needed to restore service to the Table Mountain is also needed to restore <br />service to the Bader Ditch. <br />• Approximately 500 linear feet of the ditch needs repair. <br />• Approximately 200 linear feet of the debris removal needed within the ditch <br /> <br />Hinman Ditch <br />• Ditch at Left Hand Creek is buried in debris. <br />• A survey of the extent of debris removal needed for this structure has not been completed at <br />this time. <br /> <br />Star Ditch <br />• Structure (headgate and diversion dam) was completely obliterated and is missing. Entire <br />structure will need replacement. <br />• Left Hand Creek surrounding the diversion dam site will need stabilization. A survey of the <br />extent of debris removal needed for this structure has not been completed at this time. <br /> <br />Holland Ditch <br />• Approximately 100 linear feet of the ditch bank will need stabilization. <br />• Approximately 100 linear feet of the debris removal needed within the ditch <br /> <br />Williamson Ditch <br />• Extensive erosion took place around the headgate and diversion structure. <br />• Headgate wheel destroyed. <br />• Secondary headgate wheel well filled with sediment. <br />• Left Hand Creek surrounding the diversion dam site will need stabilization <br />
The URL can be used to link to this page
Your browser does not support the video tag.