Laserfiche WebLink
Emergency Loan Application and Feasibility Study [LEFT HAND DITCH COMPANY] Page | 17 <br /> <br />• Replace upper section of the ditch. <br />• Remove debris from ditch <br /> <br /> Allen's Lake Filler Canal at Geer Canyon Road <br />• Replace culvert where ditch crosses Geer Canyon at road. <br />• Remove debris in this area. <br /> <br />Table Mountain Ditch <br />• Survey and design new dam and headgate structure. <br />• Remove destroyed and unusable diversion dam and headgate structure. <br />• Replace diversion and headgate structure. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br />• Restore Left Hand Creek to its pre-flood channel in this area. <br />• Repair ditch. <br />• Remove debris in ditch. <br />• Evaluate and install possible flood mitigation measures to prevent future damage. <br />• Evaluate and install possible fish passage structures to enhance the ability of fish to move <br />through the structure. <br /> <br />Bader Ditch <br />• Survey and design new dam and headgate structure. <br />• Replace diversion dam and headgate structure. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br />• Evaluate if it is cost effective to consolidate the Bader and Table Mountain Diversions <br />because of their close proximity. (This may cost less than building two separate <br />structures.) <br />• Repair ditch. <br />• Remove debris in ditch. <br /> <br />Hinman Ditch <br />• Remove debris in ditch. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br /> <br />Star Ditch <br />• Survey and design new dam and headgate structure. <br />• Replace diversion dam and headgate structure. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br />• Repair ditch. <br />• Remove debris in ditch. <br />• Stabilize Left Hand Creek around the diversion dam. <br /> <br />Holland Ditch <br />• Repair ditch bank. <br />• Remove debris in this area. <br />• Ensure measuring device operates to State Engineer’s Office Standards.