My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150370 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150370 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2015 4:27:28 PM
Creation date
2/26/2014 11:53:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-008
C150370
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Emergency Loan Application and Feasibility Study [LEFT HAND DITCH COMPANY] Page | 16 <br /> <br />Depending on the availability of funding and the feasibility of enhancements, the Company could <br />install the flood mitigation measures and environment enhancements described in the bullets <br />above. If installed these improvements may allow the ditch facilities to meet multiple objectives <br />including water diversion, environmental enhancement, and flood mitigation. However, funding <br />sources for enhancements has not been identified at this time. If funding were to become <br />available for enhancements the Company would be willing to consider implementing these items <br />on a case by case basis. However, because funding sources for enhancements are unidentified, <br />implementing this alternative is not practicable at this time. <br /> <br />Selected Alternative 3 – Restore Left Hand Ditch Company System to Pre-Flood Condition <br /> <br />This alternative involves rebuilding the Left Hand Ditch System to its pre-flood condition. <br /> <br />Elements of this Alternative Include: <br /> <br />Left Hand Creek Parshall Flume and Recorder Station <br />• Prepare design for new Parshall flume and recorder station <br />• Replace Parshall flume and recorder station. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br /> <br />Left Hand Valley Reservoir <br />• Perform Debris removal at the inlet into the lake. <br />• Repair Dam spillway. <br />• Repair dam access road. <br />• Repair secondary spillway. <br /> <br />Left Hand Valley Diversion <br />• Restore Left Hand Creek to its pre-flood channel in this area. <br />• Repair Left Hand Valley filler ditch. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br /> <br />Crocker Ditch <br />• Restore Left Hand Creek to its pre-flood channel in this area. <br />• Remove debris from ditch. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br /> <br />Allen's Lake Filler Canal Head Gate (Also Lake Ditch inlet and Toll Gate Ditches headgate) <br />• Survey and design new dam and headgate structure. <br />• Replace diversion dam and headgate structure. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br />• Coordinate with Boulder County Transportation when road and diversion dam work takes <br />place. <br />• Perform grade survey to determine if the Parshall Flume is still useable. <br />• Replace Parshall Flume if necessary.
The URL can be used to link to this page
Your browser does not support the video tag.