Laserfiche WebLink
Emergency Loan Application and Feasibility Study [LEFT HAND DITCH COMPANY] Page | 16 <br /> <br />Depending on the availability of funding and the feasibility of enhancements, the Company could <br />install the flood mitigation measures and environment enhancements described in the bullets <br />above. If installed these improvements may allow the ditch facilities to meet multiple objectives <br />including water diversion, environmental enhancement, and flood mitigation. However, funding <br />sources for enhancements has not been identified at this time. If funding were to become <br />available for enhancements the Company would be willing to consider implementing these items <br />on a case by case basis. However, because funding sources for enhancements are unidentified, <br />implementing this alternative is not practicable at this time. <br /> <br />Selected Alternative 3 – Restore Left Hand Ditch Company System to Pre-Flood Condition <br /> <br />This alternative involves rebuilding the Left Hand Ditch System to its pre-flood condition. <br /> <br />Elements of this Alternative Include: <br /> <br />Left Hand Creek Parshall Flume and Recorder Station <br />• Prepare design for new Parshall flume and recorder station <br />• Replace Parshall flume and recorder station. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br /> <br />Left Hand Valley Reservoir <br />• Perform Debris removal at the inlet into the lake. <br />• Repair Dam spillway. <br />• Repair dam access road. <br />• Repair secondary spillway. <br /> <br />Left Hand Valley Diversion <br />• Restore Left Hand Creek to its pre-flood channel in this area. <br />• Repair Left Hand Valley filler ditch. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br /> <br />Crocker Ditch <br />• Restore Left Hand Creek to its pre-flood channel in this area. <br />• Remove debris from ditch. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br /> <br />Allen's Lake Filler Canal Head Gate (Also Lake Ditch inlet and Toll Gate Ditches headgate) <br />• Survey and design new dam and headgate structure. <br />• Replace diversion dam and headgate structure. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br />• Coordinate with Boulder County Transportation when road and diversion dam work takes <br />place. <br />• Perform grade survey to determine if the Parshall Flume is still useable. <br />• Replace Parshall Flume if necessary.