My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150365 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150365 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:23:10 PM
Creation date
2/26/2014 11:51:40 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150365
CT2015-006
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
20
County
Hinsdale
Mineral
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTIONFOUR Formulation of Alternatives <br /> 4-3 <br />spillway chute will be installed, with a new floor slab and chute walls being constructed on the <br />interior of the remaining portion of the existing chute. A drainage system will be installed <br />beneath the spillway chute. This system will consist of an 8-inch. HDPE underdrain pipe <br />embedded in drain gravel with a layer of filter sand on the outside of the gravel. Spillway chute <br />walls will be anchored to the adjacent ground with soil nail anchors and rock bolts, and <br />foundation anchors will be installed to anchor the chute floor to the underlying embankment. <br />Instrumentation proposed for Continental Dam includes structural survey points on the <br />reinforced concrete spillway, movement monuments on the filter blanket, two new nested <br />piezometers near the maximum section, and a metering manhole on the toe drain pipe. The <br />existing piezometers are to be modified to accommodate the revised grading on the downstream <br />face of the dam. <br />Borrow for filter sand, drain gravel, and common fill is expected to be required for the <br />dam rehabilitation and will be imported. Excavation will take place for construction of the filter <br />blanket, toe drain, spillway chute, and stilling basin. The excavated materials can be screened <br />and then used as common fill material or riprap. <br />Design drawings and a detailed construction cost estimate are presented in Appendix D.
The URL can be used to link to this page
Your browser does not support the video tag.