Laserfiche WebLink
to the noted preferred alternative design cannot stipulate as to what the exact reasonable to state that the outlet structure will b preferred alternative conditions and the topography <br />than what has been proposed in the 2007 AECOM/TCB construction of the new wastewater treatment plant, does contemplate the routing of conveyance piping, among other findings, thus, Georgetown <br />did not want to miss represent to CWCB that the final design will be exactly what the preferr alternative describes. We hope the above responses provide some appreciate CWCB’s interest <br />in bein contact either Tom or I anytime. ___________________________ Todd E. Ficken, P.E., M.B.A. F&D International L.L.C. Fn = 002 GTWN 13Jun11 Memo source of information. engineering: <br />I wanted to be sure that we’re all on the same page with this As long as the preferred intent of the original project approved by our board, Georgetown will be constructing an outlet <br />structure, which is design. At this juncture we final outlet structure will look like, but it is be within the “intent” as noted in the feasibility report. Based upon actual field of <br />the site, there are very few solutions, if any, other n study. As noted, the clarifications to your questions. Again, we greatly being Georgetown’s funding partner and please do not <br />. of the tudy. preferred g hesitate to <br />