Laserfiche WebLink
Table 5: Alternative 2 Cost Opinion Summary <br />Project 1 - Diversion Headgate replacement <br />Item Description QuantityUnitUnit Cost ($)Extended Cost ($) <br />Replace headgate 1LS 50,000 $50,000 <br />Subtotal $50,000 <br />Contingency (15%)$7,500 <br />Total $57,500 <br />Project 2 - Broadway pipeline replacement <br />Item Description QuantityUnitUnit Cost ($)Extended Cost ($) <br />Mobilization 1LS $9,000 $9,000 <br />Demolish existing pipe/structures 1LS $6,500 $6,500 <br />5-ft dia manhole 1LS $8,000 $8,000 <br />New diversion structure 1LS $10,000 $10,000 <br />5-ft dia manhole w/ formed invert 1LS $9,000 $9,000 <br />36-inch PE 650LF $80 $52,000 <br />Repair driveways 600SF $2 $1,200 <br />Provide/place fill in right-of-way 120CY $10 $1,200 <br />Traffic control 1LS $5,000 $5,000 <br />Railroad flagging/permits 1LS $3,000 $3,000 <br />Incidental removal/replacement (signs, delineators, etc.)1LS $1,500 $1,500 <br />Subtotal $106,400 <br />Contingency (20%)$21,280 <br />Total $127,680 <br />Project 3 - Rehabilitate existing spillway <br />Item Description QuantityUnitUnit Cost ($)Extended Cost ($) <br />Mobilization 1LS $4,000 $4,000 <br />Demolish existing pipe/structures/vegetation 1LS $15,000 $15,000 <br />Rehabilitate existing channel 1LS $2,500 $2,500 <br />Concrete headwall 1LS $15,000 $15,000 <br />Slide Gates 1E A $9,000 $9,000 <br />Subtotal $45,500 <br />Contingency (25%)$11,375 <br />Total $56,875 <br />Project 4 - New fence along mobile home park <br />Item Description QuantityUnitUnit Cost ($)Extended Cost ($) <br />Mobilization 1LS $5,000 $5,000 <br />Clearing and grubbing 1LS $3,500 $3,500 <br />Chain-link fencing - 8-foot 2000LF $25 $50,000 <br />Subtotal $58,500 <br />Contingency (25%)$14,625 <br />Total $73,125 <br /> 9