My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150315 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150315 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:24:21 AM
Creation date
2/26/2014 11:24:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150315
Contractor Name
Snowmass Water & Sanitation District
Contract Type
Loan
Water District
38
County
Pitkin
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(800 EQR) and Re-Development projects (500 EQR). According to the <br />District, projects included in the 500 EQR Redevelopment are Snowmass <br />Center Re-Development, Mall Revitalization, Employee Housing Projects, <br />Entryway Project and Town Hall Project. <br />2. District Build-Out. The projected Level of Development at District Build-Out <br />is estimated to be 6,200 EQRs. The additional 300 EQRs that are included in <br />this Level of Development, in addition to the Existing Municipal Demand With <br />Base Village and Redevelopment Level of Development, are an estimate <br />based on the Town of Snowmass Village Comprehensive Plan Build-Out <br />Chart. <br />3. Build-Out With Reserve. The projected Level of Development at Build-Out <br />With Reserve is estimated to be 6,800 EQRs. This Level of Development is <br />an assumed maximum development level that may result from additional <br />future redevelopment and infill development within the District. This level of <br />development is 110 percent of the District Build-Out development level. <br />The total number of EQRs in the District at each level of development was used <br />in conjunction with the most recent historic water usage records to estimate the District <br />demand for each Level of Development. <br />Snowmaking. The snowmaking demand for Snowmass Ski Area currently totals <br />about 50 MG beginning in the middle of October and extending through the end of <br />December. Snowmaking uses are generally supplied as 2.25 MGD (7 ac-ft per day) for <br />three consecutive days every ten days (i.e. three days of snowmaking and then seven <br />days with no snowmaking, for a total snowmaking volume of 6.75 MG (21 ac-ft) every 10 <br />days). <br />Snowmaking use is currently decreed for and provided by the junior East <br />Snowmass Brush Creek Pipeline and Snowmass Creek Pipeline water rights <br />(Administration Number 52013), which are junior to the Snowmass Creek minimum <br />stream flow water right. These water rights are decreed for snowmaking use during the <br />October 15 through December 31 each year. The snowmaking water rights, the junior <br />East Snowmass Brush Creek Pipeline and Snowmass Creek Pipeline, are not decreed <br />for storage. It is assumed that only short term operational storage will be utilized for <br />operating these snowmaking water rights, and therefore the potential snowmaking water <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.