My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150315 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150315 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:24:21 AM
Creation date
2/26/2014 11:24:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150315
Contractor Name
Snowmass Water & Sanitation District
Contract Type
Loan
Water District
38
County
Pitkin
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
adjusted to quarterly EQR data provided by the District. Future municipal water use in <br />the District is assumed to follow a similar seasonal pattern and usage. <br />TABLE 1 <br />CURRENT DEMAND PER EQR <br />Quarterly Average Daily <br />Month EQRs Use per EQR <br />(gal) <br />Januar 266 <br />Februar 4,483 269 <br />March 263 <br />April 182 <br />Ma 4,547 300 <br />June 489 <br />Jul 525 <br />August 4,562 523 <br />� September � � 415 � <br />� October � � 192 � <br />November 4,563 172 <br />December 258 <br />Annual Average 4,539 323 <br />For the purpose of analyzing the amount of raw water storage needed to <br />maintain municipal water service during a catastrophic event, a range of municipal <br />demands from 172 to 275 gallons per day per EQR was considered. The maximum <br />average municipal daily use of 275 gallons per day per EQR was used for examination <br />of a catastrophic event that occurs during the summer months since all outside irrigation <br />would be curtailed. <br />Levels of Development. The projected municipal demand was examined for <br />three Levels of Development as defined below. <br />1. Existing Municipal Demand With Base Village and Redevelopment. The <br />projected Level of Development for Existing Municipal Demand With Base <br />Village and Redevelopment is estimated to be 5,900 EQRs. This Level of <br />Development includes the existing municipal demand (4,600 EQRs), and the <br />projected increases in District water demand resulting from the Base Village <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.