My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150313 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150313 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:21:09 AM
Creation date
2/26/2014 11:21:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150313
Contractor Name
Huerfano-Cucharas Irrigation Company
Contract Type
Loan
Water District
16
County
Huerfano
Pueblo
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Application <br /> <br />3 <br />7. Please list the names, addresses and phone numbers of the Applicants’ engineer(s) and <br />attorney(s). <br /> NAME ADDRESS and PHONE <br /> Applegate Group (Engineering) Mike Applegate, 1499 West 120th Ave, Ste, 200, Denver CO <br />80234 ph: 303-452-6611 <br /> GEI Consultants (Engineering) Steven Townsley, 6950 S Potomac St., Ste 300, Centennial CO <br /> Bishop-Brodgen (Hydrologist) Mike Sayler or Jeff Clark, 333 W Hampden Ave., Ste, 1050 <br /> Englewood CO 80110 ph: 303-806-8952 <br /> Krassa & Miller (water attny) Robert Krassa, 2344 Spruce Street, Ste A, Boulder CO 80302- <br />4672 <br />8. List any feasibility studies or other investigations that have been completed or are now in progress for the proposed project. If so, submit one copy of the study with this application <br />Feasibility study authored by the Applegate Group is included in this application. <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br /> Phase I: <br />Estimated Engineering Costs: $ 1,400,000 (includes admin and permitting) <br /> Estimated Construction Costs: $ 200,000 <br /> Estimated Other Costs: $ -0- <br /> <br /> Estimated Total Costs: $ 1,600,000 <br />Phase II: <br />Estimated Engineering Costs: $ 200,000 (includes admin and permitting) <br /> Estimated Construction Costs: $ 22,343,000 <br /> Estimated Other Costs: $ -0- <br /> <br /> Estimated Total Costs: $ 22,543,000 <br />The GEI report has the cost for Phase II at $26,743,000. This amount includes $2,100,000 in <br />contingencies and $2,100,000 in construction administration and engineering. These amounts <br />($4,100,000) have been subtracted from GEI’s estimated costs. <br />10. Loan amount and terms you are requesting. <br /> We are requesting a loan of $9,900,000 plus loan closing costs of $99,000 for a total request of
The URL can be used to link to this page
Your browser does not support the video tag.