Laserfiche WebLink
Long Hollow Dam and Reservoir Phase I Summary Report <br /> • Red Mesa Aquifer Groundwater Study 2002 Interim Report. November 2002. Wright <br /> Water Engineers, Inc. <br /> • Red Mesa Ward Dam Enlargement Feasibility Study, Volumes I and II. April 2003. <br /> Wright Water Engineers, Inc. <br /> • Review of Selenium and Salinity Issues in La Plata River. Draft—February 2004. Wright <br /> Water Engineers, Inc. <br /> • Southwestern Willow Flycatcher Survey. May-July 2003. Ecosphere Environmental <br /> Services. <br /> • Stream Flow Data—Water Years 1989-1998. February 20, 2004. Wright Water <br /> Engineers, Inc. <br /> • Wetland Delineation for Long Hollow Site. May 2003. <br /> • Wetland Impact Evaluation and Preliminary Mitigation Plan. October 2003. Wright <br /> Water Engineers, Inc. <br /> E:\Documents\Wwe Wei\2004\991-077\080-110\Task 5\Summary Report\Summary Report Red Dot\Report 7-12-04.doc <br /> 991-077.115 Wright Water Engineers, Inc. Page 24 <br /> July 2004 <br />