Laserfiche WebLink
Long Hollow Dam and Reservoir Phase I Summary Report <br /> In summary, based on the work performed for those issues studied for the LHR Phase I <br /> feasibility study, there are no apparent fatal flaws that would make the LHR project <br /> infeasible at this level of study. <br /> 10.0 PHASE I AND RELATED STUDIES <br /> • Addendum to Biological Assessment for the Proposed Long Hollow Reservoir. <br /> November 2003. Wright Water Engineers, Inc. <br /> • Biological Assessment for the Proposed Long Hollow Reservoir. September 2003. <br /> Wright Water Engineers, Inc. and Ecosphere Environmental Services. <br /> • Biological Assessment Supplement. June 22, 2004. Wright Water Engineers, Inc. <br /> • Biological Issues/Fatal Flaws Preliminary Assessment. January 27, 2003. Ecosphere <br /> Environmental Services. <br /> • Cultural Resources Survey and Site Assessment for LPWCD's Long Hollow Reservoir. <br /> July 10, 2003. La Plata Archaeological Consultants. <br /> • Feasibility Level Engineering Geology Study, Long Hollow Dam and Reservoir. January <br /> 31, 2003. Hepworth-Pawlak Geotechnical. <br /> • Harris Water Engineering. Undated (Circa 1995). Reconnaissance-Level <br /> Elevation/Stage/Capacity Table for Long Hollow Reservoir. <br /> • Long Hollow Reservoir Individual Permit Application. October 23, 2003. Wright Water <br /> Engineers, Inc. <br /> • Long Hollow Reservoir Operation Plan. March 2004. Wright Water Engineers, Inc. <br /> Macroinvertebrate Study. August 2003. Ecosphere Environmental Services. <br /> 991-077.115 Wright Water Engineers, Inc. Page 23 <br /> July 2004 <br />