My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150094 Phase I Report
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150094 Phase I Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:24:41 PM
Creation date
2/19/2014 3:15:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150094
Contractor Name
La Plata Water Conservancy District
Contract Type
Grant
County
La Plata
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Long Hollow Dam and Reservoir Phase I Summary Report <br /> on June 19, 2003. Kara Hellige, USACE Chief at the Durango Regulatory office, also has visited <br /> the site. <br /> 6.3.1 Direct Impacts <br /> Wetlands in the LHR area were mapped and quantified by WWE. The proposed project would <br /> impact a total of 18,560 linear feet (LF) of perennial channel, including 2.5 acres of emergent <br /> wetland active channel, and 2,180 LF of ephemeral drainage. The impacts would be from native <br /> materials removed or used to construct the LHR embankment and from inundation by LHR. A <br /> summary of impacts by type is shown in Table 3 below. <br /> TABLE 3 <br /> Summary of Impacts to Wetlands and Other Waters <br /> Active Channel <br /> Ephemeral <br /> Emergent Perennial <br /> Drainage <br /> Wetland Drainage <br /> Government Draw 46,480 FT2 7,040 LF 700 LF <br /> (1.07 Acres) <br /> 62,156 FT2 11,520 LF <br /> Long Hollow 1,480 LF <br /> (1.43 Acres) <br /> TOTAL 2.5 Acres 18,560 LF 2,180 LF <br /> 6.3.2 Preliminary Wetlands Mitigation Plan <br /> Impacts from the project to the 18,560 LF (3.52 miles) of active channel (2.5 acres of emergent <br /> wetlands and 18,560 LF of perennial drainage) and 2,180 LF of ephemeral drainage will require <br /> mitigation. LPWCD has proposed the following mitigation options: <br /> • Wetland Creation. Wetland creation is proposed below the LHR embankment and <br /> upstream of the proposed dam to mitigate the 2.5 acres of emergent wetland impacts <br /> 991-077.115 Wright Water Engineers, Inc. Page 12 <br /> July 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.