Laserfiche WebLink
5.• _ The booklet and glide show: <br />Wednesday, September 16 - Met with Kate Jones to discuss the content, <br />potential resource materials and technical advisors for the booklet and <br />slide show she will be developing, and the interface of the literature <br />with the timing and content of the field workshops. <br />6. ObJectives to be accomplished in the next quarter ending February 28. 1993. <br />. . - a: - Develop a draft plan for the four wetlands workshops <br />- meetings are scheduled with David Cooper and. Steve Dougherty on <br />January 7 and 12, 1993 to determine instructional content and <br />geographical emphasis of field workshops. <br />communicate by telephone with each member of the Wetlands <br />Resource Group prior to the February 2 meeting for input about <br />field trip sites and useful contacts. <br />- begin to develop logistical information base and costs for each field <br />trip including means transportation, meals, locations of specific <br />ecosystems to be visited, target participants, marketing plan and <br />needs for outreach. <br />- present draft plan to Wetlands Resource Group on February 2 and <br />redefine plan by including the Group's recommendations. <br />- begin field site visits to confirm logistical needs. <br />b. Interface with Steve Dougherty in developing his presentation to the <br />. Wetlands Resource Group on the Mitigation Banking study. <br />20d 900 2inii lSNI 7d0I50-1002 3N8CH1 Ob6366b6O6 Z6:bl 02— tO —E6, <br />