My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13000000095 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
13000000095 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2014 12:26:10 PM
Creation date
2/5/2014 12:26:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
13000000095
Contractor Name
Santa maria Reservior Company
Contract Type
Grant
Water District
20
County
Hinsdale
Mineral
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br /> r <br /> Mr.Travis Smith <br /> Mr.Jay Yeager <br /> February 27,2013 <br /> Page 3 <br /> It is anticipated that field surveys of critical bridges in the study reach will not be necessary. <br /> Correspondence shall be with Matt Gavin of the Colorado Division of Water Resources to <br /> present preliminary dam breach parameters,water surface profile modeling,and inundation <br /> mapping and to discuss if field measurements are necessary for critical bridges. <br /> Inundation maps of the clear day failures of the three dams shall he overlaid on 1-meter <br /> resolution aerial photography. <br /> DELIVERABLES <br /> For each of these three reservoirs,the deliverables for this project shall include up to 10 copies of <br /> a bound report containing the inundation mapping analysis(stamped by a Colorado P.E.)and the <br /> inundation maps. Also included for each of the reservoirs will be two CDs containing: digital <br /> files of the inundation limits that are compatible with ESRI ARCView software,PDF file of the <br /> inundation maps,and hydraulic/hydrologic models. <br /> SCHEDULE <br /> Work on this project will begin in February 2013 with delivery of the final products no later than <br /> June 1,2013 for Continental and Santa Maria Reservoirs and September 30,2013 for Rio <br /> Grande Reservoir. <br /> COST <br /> Assuming that the inundation mapping does not extend downstream of the limit discussed,the <br /> estimated cost for completing these task items for all three reservoirs is$45,000. This estimate is <br /> summarized in the attached Table 1. This cost estimate is prepared assuming that the Rio <br /> Grande Reservoir routing to the state line is prepared initially and subsequent analyses of <br /> Continental Reservoir and Santa Maria Reservoir can be performed at a reduced cost over this <br /> duplicated study reach. The distribution of costs is$21,600 for Rio Grande Reservoir(San Luis <br /> Valley Irrigation District)and$23,400 for Continental and Santa Maria Reservoirs(Santa Maria <br /> Reservoir Company). <br /> The work shall be performed on an hourly basis for services rendered with a not-to-exceed fee of <br /> $45,000. In the event that additional services are requested,the District and the Company shall <br /> be advised of the additional cost for such services prior to performance of the work. Invoices <br /> shall be submitted on a monthly basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.