My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13000000095 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
13000000095 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2014 12:26:10 PM
Creation date
2/5/2014 12:26:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
13000000095
Contractor Name
Santa maria Reservior Company
Contract Type
Grant
Water District
20
County
Hinsdale
Mineral
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> DEERE & AULT <br /> February 27,2013 <br /> Mr.Travis Smith <br /> San Luis Valley irrigation District <br /> P.Q.Box 637 <br /> 269 Miles Street <br /> Center,Colorado 81125 <br /> Mr.Jay Yeager <br /> Santa Maria Reservoir Company <br /> P.U.Box 288 <br /> Monte Vista,Colorado 81144 <br /> Re: Proposal for Inundation Mapping for Rio Grande Reservoir,Continental Reservoir, <br /> and Santa Maria Reservoir <br /> Dear Mr.Smith and Mr.Yeager: <br /> Deere&Ault Consultants,Inc.(D&A)has been requested to submit this proposal to the San <br /> Luis Valley Irrigation District(District)and the Santa Maria Reservoir Company(Company)for <br /> the preparation of dam breach inundation mapping for the dams at Rio Grande Reservoir, <br /> Continental Reservoir,and Santa Maria Reservoir. We understand that the purpose of the breach <br /> modeling and the associated inundation mapping is for inclusion in the Emergency Action Plans <br /> for these reservoirs. <br /> SCOPE OF STUDY <br /> The scope of this study is to perform dam breach modeling in accordance with the latest Breach <br /> Guidelines published by the Colorado Dam Safety Branch. The level of analysis shall be <br /> "Simple"as described in Table 1 of the Guidelines for both the breach modeling and flood <br /> inundation mapping. Flood routing models and inundation mapping shall be based on the USGS <br /> 10-meter Digital Elevation Model(DEM)or best available topographic mapping. <br /> The limits of the dam breach flood mapping for Rio Grande Reservoir shall extend from Rio <br /> Grande Reservoir downstream to where the breach flood impacts are no longer significant.The <br /> inundation mapping downstream from Rio Grande Reservoir is expected to extend from the darn <br /> down the Rio Grande and terminate at or before the Colorado-New Mexico state line. <br /> The inundation mapping for Continental Reservoir will extend along Clear Creek from the dam <br /> down to the Rio Grande confluence,and then downstream along the Rio Grande to where the <br /> 60(1 S.Airport Road,Building A.Si o[e 205 <br /> Longmont.CO 60503 <br /> Phonc 303-651-1468•Fax: 303.651-1469 <br />
The URL can be used to link to this page
Your browser does not support the video tag.