Emergency Loan Application and Feasibility Study Beeman Irrigating Ditch and Milling Co. <br />Phase 1— Demolition of the existing, inoperable structures. Reconstruction of the joint <br />headworks facilities (headwall, headgates, flow measurement, bifurcation structure). Diversion <br />of the river and reconstruction of the historic island structure. Restoration of the historic flow <br />pattern and resumption of diversions for irrigation and industrial use. <br />Phase 2 — Installation of an adjustable height check dam in -place of the current stop log dam at <br />the small dam. This work could include demolition and reconstruction of the existing small dam <br />structure, depending on the results of detailed engineering investigation. <br />Phase 3 — Demolition of a portion of the existing "big dam" structure at the South Platte River. <br />It is believed that the immovable weir at this location contributed to the flood damage <br />experienced during the recent event. This portion of the dam would be replaced with a section of <br />adjustable height check dam. This work could include demolition and reconstruction of the <br />existing big dam structure, depending on the results of detailed engineering investigation. This <br />phase may also require other permitting through Weld County Floodplain Management (to be <br />determined). This phase could potentially be completed in conjunction with Phase 2. <br />Phase 4 — The west bank of the inlet channel was eroded during the recent flooding and could be <br />migrating westerly onto the adjoining landowners property. Beeman/MI2 will coordinate with <br />the landowner to complete a joint bank stabilization project. The scope of this work will depend <br />on the results of detailed engineering investigation and the joint agreement reached with the <br />affected landowner. <br />on Schedule - Beeman <br />N <br />Q4 -2013 1 Q1 -2014 I Q2 -2014 1 Q3 -2014 Q4 -2014 J Q1 -2015 [___Q2 -2015 __JI <br />Cost Estimate <br />The Project cost estimate, provided by Eckas Water Solutions, is $2,000,000 and is further <br />broken down as follows: <br />Task <br />Cost <br />Design <br />$1465810 <br />Permitting <br />NIA <br />Construction <br />$15468,098 <br />Other <br />N/A <br />Contingency <br />$3855092 <br />Total <br />$25000,000 <br />